ETSI TS 132 426 V15.2.0 (2019-04)

LTE; Telecommunication management; Performance Management (PM); Performance measurements Evolved Packet Core (EPC) network (3GPP TS 32.426 version 15.2.0 Release 15)

ETSI TS 132 426 V15.2.0 (2019-04)

Name:ETSI TS 132 426 V15.2.0 (2019-04)   Standard name:LTE; Telecommunication management; Performance Management (PM); Performance measurements Evolved Packet Core (EPC) network (3GPP TS 32.426 version 15.2.0 Release 15)
Standard number:ETSI TS 132 426 V15.2.0 (2019-04)   language:English language
Release Date:16-Apr-2019   technical committee:3GPP SA 5 - Telecom Management
Drafting committee:   ICS number:
ETSI TS 132 426 V15.2.0 (2019-04)






TECHNICAL SPECIFICATION
LTE;
Telecommunication management;
Performance Management (PM);
Performance measurements Evolved Packet Core (EPC)
network
(3GPP TS 32.426 version 15.2.0 Release 15)

---------------------- Page: 1 ----------------------
3GPP TS 32.426 version 15.2.0 Release 15 1 ETSI TS 132 426 V15.2.0 (2019-04)



Reference
RTS/TSGS-0532426vf20
Keywords
LTE
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00  Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88

Important notice
The present document can be downloaded from:

The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at

If you find errors in the present document, please send your comment to one of the following services:

Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.

© ETSI 2019.
All rights reserved.

TM TM TM
DECT , PLUGTESTS , UMTS and the ETSI logo are trademarks of ETSI registered for the benefit of its Members.
TM TM
3GPP and LTE are trademarks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and
of the oneM2M Partners.

GSM and the GSM logo are trademarks registered and owned by the GSM Association.
ETSI

---------------------- Page: 2 ----------------------
3GPP TS 32.426 version 15.2.0 Release 15 2 ETSI TS 132 426 V15.2.0 (2019-04)
Contents
1 Scope . 11
2 References . 11
3 Measurement family and abbreviations. 12
3.1 Measurement family . 12
3.2 Abbreviations . 13
4 Measurements related to the MME . 13
4.1 Mobility Management . 13
4.1.1 EPS attach procedures . 13
4.1.1.0 General . 13
4.1.1.1 Attempted EPS attach procedures . 13
4.1.1.2 Successful EPS attach procedures . 13
4.1.1.3 Failed EPS attach procedures . 14
4.1.1.4 Combined EPS/IMSI attach . 14
4.1.1.4.0 General . 14
4.1.1.4.1 Attempted combined attach procedures . 14
4.1.1.4.2 Successful combined attach procedures . 15
4.1.1.4.3 Failed combined attach procedures . 15
4.1.1.5 EPS emergency attach procedures . 15
4.1.1.5.0 General . 15
4.1.1.5.1 Attempted emergency attach procedures . 16
4.1.1.5.2 Successful emergency attach procedures . 16
4.1.1.5.3 Failed emergency attach procedures . 16
4.1.2 UE-initiated EPS Detach procedure . 17
4.1.2.1 Attempted EPS detach procedures by UE . 17
4.1.2.2 Successful EPS detach procedures by UE . 17
4.1.3 MME-initiated EPS Detach procedure . 17
4.1.3.1 Attempted EPS detach procedures by MME . 17
4.1.3.2 Successful EPS detach procedures by MME . 18
4.1.4 HSS-initiated EPS Detach procedure . 18
4.1.4.1 Attempted EPS detach procedures by HSS . 18
4.1.4.2 Successful EPS detach procedures by HSS . 18
4.1.5 Tracking area update procedure with Serving GW change . 19
4.1.5.0 General . 19
4.1.5.1 Attempted tracking area update procedure with Serving GW change . 19
4.1.5.2 Successful tracking area update procedure with Serving GW change . 19
4.1.5.3 Failed tracking area update procedure with Serving GW change . 19
4.1.6 Tracking area update procedure without Serving GW change. 20
4.1.6.0 General . 20
4.1.6.1 Attempted tracking area update procedure without Serving GW change . 20
4.1.6.2 Successful tracking area update procedure without Serving GW change . 20
4.1.6.3 Failed tracking area update procedure without Serving GW change . 21
4.1.7 EPS paging procedures . 21
4.1.7.0 General . 21
4.1.7.1 Attempted EPS paging procedures . 21
4.1.7.2 Successful EPS paging procedures . 21
4.1.7.3 Failed EPS paging procedures. 22
4.1.8 MME control of overload related measurements for EPC . 22
4.1.8.1 Attempted Overload Start procedure . 22
4.1.8.2 Attempted Overload Stop procedure . 22
4.1.9 EMM-Registered subscribers. 23
4.1.9.1 Mean number of EMM-Registered subscribers . 23
4.1.9.2 Maximum number of EMM-Registered subscribers . 23
4.1.10 Handover related measurements . 23
4.1.10.1 Inter RAT handover . 23
4.1.10.1.1 Incoming inter RAT handover . 23
4.1.10.1.1.1 Attempted incoming inter RAT handover. 23
4.1.10.1.1.2 Successful incoming inter RAT handover . 24
ETSI

---------------------- Page: 3 ----------------------
3GPP TS 32.426 version 15.2.0 Release 15 3 ETSI TS 132 426 V15.2.0 (2019-04)
4.1.10.1.2 Outgoing inter RAT handover . 24
4.1.10.1.2.1 Attempted outgoing inter RAT handover . 24
4.1.10.1.2.2 Successful outgoing inter RAT handover . 24
4.1.11 Routeing area update with MME interaction . 25
4.1.11.0 General . 25
4.1.11.1 Attempted routeing area update with MME interaction . 25
4.1.11.2 Successful routeing area update with MME interaction and without S-GW change . 25
4.1.11.3 Failed routeing area update with MME interaction and without S-GW change . 26
4.1.11.4 Successful routeing area update with MME interaction and with S-GW change . 26
4.1.11.5 Failed routeing area update with MME interaction and with S-GW change. 26
4.1.12 Combined TA/LA update procedure. 27
4.1.12.0 General . 27
4.1.12.1 Attempted Combined TA/LA update . 27
4.1.12.2 Successful Combined TA/LA update . 27
4.1.12.3 Failed Combined TA/LA update . 27
4.1.13 Number of implicit detach related measurements . 28
4.2 Session Management . 28
4.2.1 Number of dedicated EPS bearers in active mode (Mean) . 28
4.2.2 Number of dedicated EPS bearers in active mode (Maximum) . 28
4.2.3 Dedicated bearer set-up time by MME (Mean) . 29
4.2.4 MME initiated dedicated bearer activation . 29
4.2.4.1 Attempted dedicated bearer activation procedures by MME . 29
4.2.4.2 Successful dedicated bearer activation procedures by MME . 29
4.2.4.3 Failed dedicated bearer activation procedures by MME . 30
4.2.5 MME initiated dedicated bearer deactivation . 30
4.2.5.1 Attempted dedicated bearer deactivation procedures by MME . 30
4.2.5.2 Successful dedicated bearer deactivation procedures by MME . 30
4.2.6. MME initiated EPS bearer modification . 30
4.2.6.1 Attempted EPS bearer modification procedures by MME . 30
4.2.6.2 Successful EPS bearer modification procedures by MME . 31
4.2.6.3 Failed EPS bearer modification procedures by MME . 31
4.2.7 Total EPS Service Request . 31
4.2.7.0 General . 31
4.2.7.1 Total Attempted EPS Service Request procedures. . 31
4.2.7.2 Total Successful EPS Service Request procedures. . 32
4.2.7.3 Total failed EPS Service Request procedures. . 32
4.3 Subscriber management for MME . 32
4.3.1 Attempted insert subscriber data requests received from a HSS . 32
4.3.2 Attempted delete subscriber data requests received from a HSS . 33
4.3.3 Number of subscribers in ECM-IDLE state . 33
4.3.4 Number of subscribers in ECM-CONNECTED state . 33
4.4 S1-MME data volume related measurements . 34
4.4.1 Number of incoming IP data packets on the S1-MME interface from eNodeB to MME . 34
4.4.2 Number of outgoing IP data packets on the S1-MME interface from MME to eNodeB . 34
4.4.3 Number of octets of incoming IP data packets on the S1-MME interface from eNodeB to MME . 34
4.4.4 Number of octets of outgoing IP data packets on the S1-MME interface from MME to eNodeB . 35
4.5 Void . 35
4.6 S6a related measurements . 36
4.6.1 Update location related measurements . 36
4.6.1.1 General . 36
4.6.1.2 Attempted update location procedure. 36
4.6.1.3 Successful update location procedure . 36
4.6.1.4 Failed update location procedure . 36
4.7 S6a related measurements . 38
4.7.1 Authentication related measurements . 38
4.7.1.1 General . 38
4.7.1.2 Attempted authentication information retrieval procedure . 38
4.7.1.3 Successful authentication information retrieval procedure . 38
4.7.1.4 Failed authentication information retrieval procedure . 38
5 Measurements related to the PDN-GW for a GTP based S5/S8 . 40
5.1 Session Management . 40
ETSI

---------------------- Page: 4 ----------------------
3GPP TS 32.426 version 15.2.0 Release 15 4 ETSI TS 132 426 V15.2.0 (2019-04)
5.1.1 PDN-GW initiated Dedicated Bearer Creation . 40
5.1.1.0 General . 40
5.1.1.1 Attempted number of PDN-GW initiated Dedicated Bearer Creation . 40
5.1.1.2 Successful number of PDN-GW initiated Dedicated Bearer Creation . 40
5.1.1.3 Failed number of PDN-GW initiated Dedicated Bearer Creation . 40
5.1.2 PDN-GW initiated Dedicated Bearer Deletion . 41
5.1.2.0 General . 41
5.1.2.1 Attempted number of PDN-GW initiated Dedicated Bearer Deletion . 41
5.1.2.2 Successful number of PDN-GW initiated Dedicated Bearer Deletion . 41
5.1.2.3 Failed number of PDN-GW initiated Dedicated Bearer Deletion . 41
5.1.3 PDN-GW initiated Dedicated Bearer Modification with QoS update procedure . 42
5.1.3.0 General . 42
5.1.3.1 Attempted number of PDN-GW initiated Dedicated Bearer Modification with QoS update . 42
5.1.3.2 Successful PDN-GW initiated Dedicated Bearer Modification with QoS update . 42
5.1.3.3 Failed PDN-GW initiated Dedicated Bearer Modification with QoS update . 43
5.1.4 PDN-GW initiated Dedicated Bearer Modification without QoS update procedure . 43
5.1.4.0 General . 43
5.1.4.1 Attempted number of PDN-GW initiated Dedicated Bearer Modification without QoS update . 43
5.1.4.2 Successful number of PDN-GW initiated Dedicated Bearer Modification without QoS update . 44
5.1.4.3 Failed number of PDN-GW initiated Dedicated Bearer Modification without QoS update . 44
5.1.5 Active EPS Bearers related measurements for EPC . 44
5.1.5.0 General . 44
5.1.5.1 Mean Number of Active EPS Bearers . 44
5.1.5.2 Max Number of Active EPS Bearers . 45
5.1.6 UE requested bearer resource modification related measurements for EPC . 45
5.1.6.0 General . 45
5.1.6.1 Attempted UE requested bearer resource modification procedure . 45
5.1.6.2 Successful UE requested bearer resource modification procedure . 45
5.1.6.3 Failed UE requested bearer resource modification procedure . 46
5.1.7 PDN Connections related measurements for EPC . 46
5.1.7.0 General . 46
5.1.7.1 Mean Number of PDN Connections, per APN . 46
5.1.7.2 Max Number of PDN Connections, per APN . 47
5.1.8 Number of EPS bearer . 47
5.1.8.0 General . 47
5.1.8.1 Mean number of EPS bearers . 47
5.1.8.2 Maximum number of EPS bearers . 47
5.2 SGi related measurements . 48
5.2.0 General . 48
5.2.1 SGi incoming link usage . 48
5.2.2 SGi outgoing link usage . 48
5.3 PFCP session related measurements. 48
5.3.1 PCFP session establishment procedure . 48
5.3.1.0 General . 48
5.3.1.1 Attempted number of PFCP session establishment . 49
5.3.1.2 Successful number of PFCP session establishment . 49
5.3.1.3 Failed number of PFCP session establishment . 49
5.3.2 PCFP session modification procedure . 50
5.3.2.0 General . 50
5.3.2.1 Attempted number of PFCP session modification . 50
5.3.2.2 Successful number of PFCP session modification . 50
5.3.2.3 Failed number of PFCP session modification . 50
5.3.3 PCFP session deletion procedure . 51
5.3.3.0 General . 51
5.3.3.1 Attempted number of PFCP session deletion . 51
5.3.3.2 Successful number of PFCP session deletion . 51
5.3.3.3 Failed number of PFCP session deletion . 51
5.3.4 PFCP session report procedure . 52
5.3.4.0 General . 52
5.3.4.1 Attempted number of PFCP session report . 52
5.3.4.2 Successful number of PFCP session report . 52
5.3.4.3 Failed number of PFCP session report . 52
ETSI

---------------------- Page: 5 ----------------------
3GPP TS 32.426 version 15.2.0 Release 15 5 ETSI TS 132 426 V15.2.0 (2019-04)
6 Measurements related to the S-GW . 54
6.1 GTP related measurements . 54
6.1.1 GTP S5/S8 . 54
6.1.1.1 Number of outgoing GTP data packets on the S5/S8 interface, from S-GW to PDN-GW . 54
6.1.1.2 Number of incoming GTP data packets on the S5/S8 interface, from PDN-GW to S-GW . 54
6.1.1.3 Number of octets of outgoing GTP data packets on
...

  • Relates Information
  • ISO 8130-9:1992

    ISO 8130-9:1992 - Coating powders
    09-28
  • EN 352-2:2020/FprA1

    EN 352-2:2021/oprA1:2023
    09-28
  • IEC TS 61158-4:1999

    IEC TS 61158-4:1999 - Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 4: Data Link protocol specification Released:3/24/1999 Isbn:2831847656
    09-28
  • HD 566 S1:1990

    HD 566 S1:1998
    09-28
  • ISO 5131:1982/Amd 1:1992

    ISO 5131:1982/Amd 1:1992
    09-28
  • EN 60598-2-22:1990

    EN 60598-2-22:1996
    09-27
  • ISO 8504-2:1992

    ISO 8504-2:1992 - Preparation of steel substrates before application of paints and related products -- Surface preparation methods
    09-27
  • EN 12165:2024

    prEN 12165:2022
    09-27
  • IEC TS 61158-6:1999

    IEC TS 61158-6:1999 - Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 6: Application Layer protocol specification Released:3/24/1999 Isbn:2831847613
    09-27
  • ISO 4252:1992

    ISO 4252:1992 - Agricultural tractors -- Operator's workplace, access and exit -- Dimensions
    09-27