|
TECHNICAL SPECIFICATION
5G;
NR;
User Equipment (UE) conformance specification;
Radio transmission and reception;
Part 3: Range 1 and Range 2
Interworking operation with other radios
(3GPP TS 38.521-3 version 15.1.0 Release 15)
---------------------- Page: 1 ----------------------
3GPP TS 38.521-3 version 15.1.0 Release 15 1 ETSI TS 138 521-3 V15.1.0 (2019-04)
Reference
RTS/TSGR-0538521-3vf10
Keywords
5G
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE
Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88
Important notice
The present document can be downloaded from:
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
If you find errors in the present document, please send your comment to one of the following services:
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.
© ETSI 2019.
All rights reserved.
TM TM TM
DECT , PLUGTESTS , UMTS and the ETSI logo are trademarks of ETSI registered for the benefit of its Members.
TM TM
3GPP and LTE are trademarks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and
of the oneM2M Partners.
GSM and the GSM logo are trademarks registered and owned by the GSM Association.
ETSI
---------------------- Page: 2 ----------------------
3GPP TS 38.521-3 version 15.1.0 Release 15 2 ETSI TS 138 521-3 V15.1.0 (2019-04)
Intellectual Property Rights
Essential patents
IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The information
pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found
in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in
respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web
server (https://ipr.etsi.org/).
Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee
can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web
server) which are, or may be, or may become, essential to the present document.
Trademarks
The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners.
ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no
right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does
not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks.
Foreword
This Technical Specification (TS) has been produced by ETSI 3rd Generation Partnership Project (3GPP).
The present document may refer to technical specifications or reports using their 3GPP identities, UMTS identities or
GSM identities. These should be interpreted as being references to the corresponding ETSI deliverables.
The cross reference between GSM, UMTS, 3GPP and ETSI identities can be found under
.
Modal verbs terminology
In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and
"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of
provisions).
"must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation.
ETSI
---------------------- Page: 3 ----------------------
3GPP TS 38.521-3 version 15.1.0 Release 15 3 ETSI TS 138 521-3 V15.1.0 (2019-04)
Contents
Intellectual Property Rights . 2
Foreword . 2
Modal verbs terminology . 2
Foreword . 11
1 Scope . 12
2 References . 12
3 Definitions, symbols and abbreviations . 13
3.1 Definitions . 13
3.2 Symbols . 13
3.3 Abbreviations . 13
4 General . 14
4.1 Relationship between minimum requirements and test requirements . 14
4.2 Applicability of minimum requirements . 14
4.3 Specification suffix information . 15
4.4 Test points analysis . 15
4.5 Applicability and test coverage rules. 15
4.6 E-UTRA configuration for EN-DC FR1 tests applying the E-UTRA anchor-agnostic approach . 15
4.7 E-UTRA configuration for EN-DC FR2 tests applying the E-UTRA anchor-agnostic approach . 17
5 Operating bands and Channel arrangement . 18
5.1 General . 18
5.2 Operating bands . 19
5.2A Operating bands for CA . 19
5.2A.1 Inter-band CA between FR1 and FR2. 19
5.2B Operating bands for DC . 19
5.2B.1 General . 19
5.2B.2 Intra-band contiguous EN-DC . 20
5.2B.2.1 EN-DC . 20
5.2B.3 Intra-band non-contiguous EN-DC . 20
5.2B.3.1 EN-DC . 20
5.2B.3.2 Void. 20
5.2B.4 Inter-band EN-DC within FR1. 20
5.2B.4.1 EN-DC (two bands). 21
5.2B.4.2 EN-DC (three bands). 24
5.2B.4.3 EN-DC (four bands) . 28
5.2B.4.4 EN-DC (five bands) . 31
5.2B.4.5 EN-DC (six bands) . 31
5.2B.5 Inter-band EN-DC including FR2 . 31
5.2B.5.1 EN-DC (two bands). 32
5.2B.5.2 EN-DC (three bands). 34
5.2B.5.3 EN-DC (four bands) . 36
5.2B.5.4 EN-DC (five bands) . 36
5.2B.6 Inter-band EN-DC including both FR1 and FR2 . 37
5.2B.6.1 EN-DC (two bands). 37
5.2B.6.2 EN-DC (three bands). 37
5.2B.6.3 EN-DC (four bands) . 37
5.2B.6.4 EN-DC (five bands) . 38
5.2B.6.5 EN-DC (six bands) . 38
5.2B.7 Inter-band NR-DC between FR1 and FR2 . 38
5.2B.7.1 NR-DC (two bands) . 38
5.3 UE Channel bandwidth . 38
5.3A UE Channel bandwidth for CA . 38
5.3A.1 Inter-band CA between FR1 and FR2. 38
5.3B UE Channel bandwidth for EN-DC . 38
5.3B.1 Intra-band EN-DC in FR1 . 39
ETSI
---------------------- Page: 4 ----------------------
3GPP TS 38.521-3 version 15.1.0 Release 15 4 ETSI TS 138 521-3 V15.1.0 (2019-04)
5.3B.1.1 General . 39
5.3B.1.2 BCS for Intra-band contiguous EN-DC . 39
5.3B.1.3 BCS for Intra-band non-contiguous EN-DC . 40
5.4 Channel arrangement . 41
5.4A Channel arrangement for CA. 41
5.4B Channel arrangement for DC. 41
5.4B.1 Channel spacing for intra-band EN-DC carriers . 41
5.5 Configuration . 42
5.5A Configuration for CA . 42
5.5A.1 Inter-band CA configurations between FR1 and FR2 . 42
5.5B Configuration for DC . 44
5.5B.1 General . 44
5.5B.2 Intra-band contiguous EN-DC . 44
5.5B.3 Intra-band non-contiguous EN-DC . 44
5.5B.4 Inter-band EN-DC within FR1. 46
5.5B.4.1 Inter-band EN-DC configurations within FR1 (two bands) . 46
5.5B.4.2 Inter-band EN-DC configurations within FR1 (three bands). 50
5.5B.4.3 Inter-band EN-DC configurations within FR1 (four bands) . 57
5.5B.4.4 Inter-band EN-DC configurations within FR1 (five bands) . 64
5.5B.4.5 Inter-band EN-DC configurations within FR1 (six bands) . 68
5.5B.5 Inter-band EN-DC including FR2 . 68
5.5B.5.1 Inter-band EN-DC configurations including FR2 (two bands) . 69
5.5B.5.2 Inter-band EN-DC configurations including FR2 (three bands) . 75
5.5B.5.3 Inter-band EN-DC configurations including FR2 (four bands) . 81
5.5B.5.4 Inter-band EN-DC configurations including FR2 (five bands) . 86
5.5B.5.5 Inter-band EN-DC configurations including FR2 (six bands) . 89
5.5B.6 Inter-band EN-DC including FR1 and FR2 . 89
5.5B.6.1 Inter-band EN-DC configurations including FR1 and FR2 (two bands) . 89
5.5B.6.2 Inter-band EN-DC configurations including FR1 and FR2 (three bands) . 90
5.5B.6.3 Inter-band EN-DC configurations (four bands) . 95
5.5B.6.4 Inter-band EN-DC configurations (five bands) . 96
5.5B.6.5 Inter-band EN-DC configurations (six bands) . 96
5.5B.7 Inter-band NR-DC between FR1 and FR2 . 97
5.5B.7.1 Inter-band NR-DC configurations (two bands) . 97
6 Transmitter characteristics . 99
6.1 General . 99
6.2 Transmitter power . 99
6.2A Transmitter power for CA without EN-DC . 99
6.2A.1.1 UE maximum output power for inter-band NR CA between FR 1 and FR 2 without EN-DC . 99
6.2A.2.1 UE maximum output power reduction for inter-band NR CA between FR 1 and FR 2 without
EN-DC . 99
6.2A.3.1 UE additional maximum output power reduction for inter-band NR CA between FR 1 and FR 2
without EN-DC . 99
6.2A.4.1 UE Configured output power level for inter-band NR CA between FR 1 and FR 2 without EN-
DC . 99
6.2A.4.2 ΔTIB,c for CA . 99
6.2A.4.2.1 ΔTIB,c for inter-band NR CA between FR 1 and FR 2 without EN-DC . 99
6.2B Transmitter power for EN-DC . 100
6.2B.1 UE Maximum Output Power for EN-DC . 100
6.2B.1.1 UE Maximum Output Power for Intra-Band Contiguous EN-DC . 100
6.2B.1.2 UE Maximum Output Power for Intra-Band Non-Contiguous EN-DC . 102
6.2B.1.3 UE Maximum Output Power for Inter-Band EN-DC within FR1 . 105
6.2B.1.4 UE Maximum Output Power for Inter-Band EN-DC including FR2 . 114
6.2B.2 UE Maximum Output Power reduction for EN-DC . 114
6.2B.2.1 UE Maximum Output Power reduction for Intra-Band Contiguous EN-DC . 114
6.2B.2.2 UE Maximum Output Power reduction for Intra-Band Non-Contiguous EN-DC. 116
6.2B.2.2.1 Test purpose . 116
6.2B.2.2.2 Test applicability . 116
6.2B.2.2.3 Minimum conformance requirements . 116
6.2B.2.2.4 Test description . 116
6.2B.2.2.5 Test requirement . 117
ETSI
---------------------- Page: 5 ----------------------
3GPP TS 38.521-3 version 15.1.0 Release 15 5 ETSI TS 138 521-3 V15.1.0 (2019-04)
TBD6.2B.2.3 UE Maximum Output Power reduction for Inter-Band EN-DC within FR1 . 117
6.2B.2.3.1 Test purpose . 118
6.2B.2.3.2 Test applicability . 118
6.2B.2.3.3 Minimum conformance requirements . 118
6.2B.2.3.4 Test description . 118
6.2B.2.3.5 Test requirement . 118
6.2B.2.4 UE Maximum Output Power reduction for Inter-Band EN-DC including FR2 . 118
6.2B.2.4.1 Test purpose . 118
6.2B.2.4.2 Test applicability . 119
6.2B.2.4.3 Minimum conformance requirements . 119
6.2B.2.4.4 Test description . 119
6.2B.2.4.5 Test requirement . 120
6.2B.3 UE additional maximum output power reduction for EN-DC . 120
6.2B.3.1 UE Additional Maximum Output Power reduction for Intra-band contiguous EN-DC . 120
6.2B.3.2 UE Additional Maximum Output Power reduction for Intra-Band Non-Contiguous EN-DC . 130
6.2B.3.2.3.1 A-MPR for NS_04 . 131
6.2B.3.3 UE Additional Maximum Output Power reduction for Inter-Band EN-DC within FR1 . 134
6.2B.3.4 UE Additional Maximum Output Power reduction for Inter-Band EN-DC including FR2 . 134
6.2B.4 Configured Output Power for EN-DC . 134
6.2B.4.1 Configured Output Power Level for EN-DC . 134
6.2B.4.2 ΔTIB,c for EN-DC . 140
6.2B.4.2.3.3 ΔTIB,c for EN-DC four bands . 150
6.2B.4.2.3.4 ΔTIB,c for EN-DC five bands . 156
6.2B.4.2.3.5 ΔTIB,c for EN-DC six bands . 159
6.2B.4.2.4 ΔTIB,c for Inter-Band EN-DC including FR2 . 159
6.2B.4.2.4.1 ΔT for EN-DC two bands . 159
IB,c
6.2B.4.2.4.2 ΔT for EN-DC three bands . 159
IB,c
6.2B.4.2.4.3 ΔT for EN-DC four bands . 159
IB,c
6.2B.4.2.4.4 ΔT for EN-DC five bands . 159
IB,c
6.2B.4.2.4.5 ΔT for EN-DC six bands . 160
IB,c
6.2B.4.2.5 Inter-band EN-DC including both FR1 and FR2 . 160
6.2B.4.2.5.1 ΔT for EN-DC three bands . 160
IB,c
6.2B.4.2.5.2 ΔT for EN-DC four bands . 160
IB,c
6.2B.4.2.5.3 ΔT for EN-DC five bands . 160
IB,c
6.2B.4.2.5.4 ΔT for EN-DC six bands . 160
IB,c
6.3 Output power dynamics . 160
6.3B.1 Minimum Output Power for EN-DC . 160
6.3B.1.1 Minimum Output Power for intra-band contiguous EN-DC . 160
6.3B.1.2 Minimum output power for intra-band non-contiguous EN-DC . 161
6.3B.1.3 Minimum output power for inter-band EN-DC within FR1 . 163
6.3B.2 Transmit OFF Power for EN-DC . 164
6.3B.2.1 Transmit OFF Power for intra-band contiguous EN-DC . 164
6.3B.2.1.1 Test purpose . 164
6.3B.2.1.2 Test applicability . 164
6.3B.2.1.3 Minimum conformance requirements . 164
6.3B.2.1.4 Test description . 164
6.3B.2.1.5 Test requirements . 164
6.3B.2.2 Transmit OFF Power for intra-band non-contiguous EN-DC . 164
6.3B.2.2.1 Test purpose . 164
6.3B.2.2.2 Test applicability . 164
6.3B.2.2.3 Minimum conformance requirements . 164
6.3B.2.2.4 Test description .
...