ETSI TS 102 695-1 V13.0.0 (2019-04)

Smart Cards; Test specification for the Host Controller Interface (HCI); Part 1: Terminal features (Release 13)

ETSI TS 102 695-1 V13.0.0 (2019-04)

Name:ETSI TS 102 695-1 V13.0.0 (2019-04)   Standard name:Smart Cards; Test specification for the Host Controller Interface (HCI); Part 1: Terminal features (Release 13)
Standard number:ETSI TS 102 695-1 V13.0.0 (2019-04)   language:English language
Release Date:25-Apr-2019   technical committee:SET TEST - SET TEST
Drafting committee:   ICS number:
ETSI TS 102 695-1 V13.0.0 (2019-04)






TECHNICAL SPECIFICATION
Smart Cards;
Test specification for the Host Controller Interface (HCI);
Part 1: Terminal features
(Release 13)

---------------------- Page: 1 ----------------------
Release 13 2 ETSI TS 102 695-1 V13.0.0 (2019-04)



Reference
RTS/SCP-00HCITvd00
Keywords
smart card, terminal
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00  Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88

Important notice
The present document can be downloaded from:

The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at

If you find errors in the present document, please send your comment to one of the following services:

Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.

© ETSI 2019.
All rights reserved.

TM TM TM
DECT , PLUGTESTS , UMTS and the ETSI logo are trademarks of ETSI registered for the benefit of its Members.
TM TM
3GPP and LTE are trademarks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and
of the oneM2M Partners.

GSM and the GSM logo are trademarks registered and owned by the GSM Association.
ETSI

---------------------- Page: 2 ----------------------
Release 13 3 ETSI TS 102 695-1 V13.0.0 (2019-04)
Contents
Intellectual Property Rights . 9
Foreword . 9
Modal verbs terminology . 10
Introduction . 10
1 Scope . 11
2 References . 11
2.1 Normative references . 11
2.2 Informative references . 12
3 Definition of terms, symbols and abbreviations . 12
3.1 Terms . 12
3.2 Symbols . 12
3.3 Abbreviations . 13
3.4 Void . 13
3A Formats . 14
3A.1 Format of the table of optional features. 14
3A.2 Format of the applicability table . 14
3A.3 Status and Notations . 14
3A.4 Format of the conformance requirements tables . 15
4 Test environment . 16
4.1 Table of optional features . 16
4.2 Applicability table . 17
4.3 Information to be provided by the device supplier . 20
4.4 Test equipment . 20
4.4.0 Base Requirements . 20
4.4.1 Measurement/setting uncertainties . 21
4.4.2 Default conditions for DUT operation . 21
4.4.2.1 General . 21
4.4.2.2 Status of UICC interfaces . 21
4.4.3 Minimum/maximum conditions for DUT operation . 21
4.4.4 Conventions . 21
4.5 Test execution . 21
4.5.1 Parameter variations . 21
4.5.2 Execution requirements . 22
4.6 Pass criterion . 22
4.6.0 Principle . 22
4.6.1 Unanticipated behaviour from the DUT . 22
5 Test cases . 23
5.1 HCI architecture . 23
5.1.1 Overview . 23
5.1.2 Hosts . 23
5.1.3 Gates . 23
5.1.3.1 Conformance requirements . 23
5.1.3.2 Test case 1: existence of gates. 23
5.1.3.2.1 Test execution . 23
5.1.3.2.2 Initial conditions . 23
5.1.3.2.3 Test procedure . 24
5.1.3.3 Void. 24
5.1.4 Pipes. 24
5.1.4.1 Conformance requirements . 24
5.1.4.2 Test case 1: static pipe deletion . 25
5.1.4.2.1 Test execution . 25
5.1.4.2.2 Initial conditions . 25
ETSI

---------------------- Page: 3 ----------------------
Release 13 4 ETSI TS 102 695-1 V13.0.0 (2019-04)
5.1.4.2.3 Test procedure . 25
5.1.4.3 Test case 2: initial pipe state and persistence of pipe state and registry value . 25
5.1.4.3.1 Test execution . 25
5.1.4.3.2 Initial conditions . 25
5.1.4.3.3 Test procedure . 25
5.1.5 Registries . 26
5.1.5.1 Conformance requirements . 26
5.1.5.2 Test case 1: registry deletion . 26
5.1.5.2.1 Test execution . 26
5.1.5.2.2 Initial conditions . 26
5.1.5.2.3 Test procedure . 27
5.2 HCP . 27
5.2.1 HCP packets. 27
5.2.1.1 Conformance requirements . 27
5.2.2 HCP message structure . 28
5.2.2.1 Conformance requirements . 28
5.2.2.2 Test case 1: commands/events on pipe which is not open . 28
5.2.2.2.1 Test execution . 28
5.2.2.2.2 Initial conditions . 28
5.2.2.2.3 Test procedure . 28
5.2.3 Message fragmentation . 29
5.2.3.1 Conformance requirements . 29
5.3 Instructions . 29
5.3.1 Commands . 29
5.3.1.1 Overview . 29
5.3.1.1.1 Conformance requirements . 29
5.3.1.2 Generic commands . 29
5.3.1.2.1 ANY_SET_PARAMETER . 29
5.3.1.2.2 ANY_GET_PARAMETER. 30
5.3.1.2.3 ANY_OPEN_PIPE . 30
5.3.1.2.4 ANY_ CLOSE_P IP E . 31
5.3.1.3 Administration commands . 32
5.3.1.3.1 ADM_CREATE_PIPE . 32
5.3.1.3.2 ADM_NOTIFY_PIPE_CREATED . 32
5.3.1.3.3 ADM_DELETE_PIPE . 32
5.3.1.3.4 ADM_NOTIFY_PIPE_DELETED . 32
5.3.1.3.5 ADM_CLEAR_ALL_PIPE . 33
5.3.1.3.6 ADM_NOTIFY_ALL_PIPE_CLEARED . 33
5.3.2 Responses . 33
5.3.2.1 Conformance requirements . 33
5.3.2.2 Test case 1: response to unknown command . 33
5.3.2.2.1 Test execution . 33
5.3.2.2.2 Initial conditions . 34
5.3.2.2.3 Test procedure . 34
5.3.3 Events . 34
5.3.3.1 Conformance requirements . 34
5.3.3.2 Test case 1: reception of unknown events . 34
5.3.3.2.1 Test execution . 34
5.3.3.2.2 Initial conditions . 35
5.3.3.2.3 Test procedure . 35
5.4 GATES and subclauses . 35
5.4.1 GATES . 35
5.4.1.1 Conformance requirements . 35
5.4.2 Management gates . 35
5.4.2.1 Administration gates . 35
5.4.2.1.1 Host controller administration gate . 35
5.4.2.1.2 Host administration gate . 40
5.4.2.2 Link management gate . 40
5.4.2.2.1 Host controller link management gate . 40
5.4.2.2.2 Host link management gate . 40
5.4.2.3 Identity management gate . 41
5.4.2.3.1 Local registry . 41
ETSI

---------------------- Page: 4 ----------------------
Release 13 5 ETSI TS 102 695-1 V13.0.0 (2019-04)
5.4.2.3.2 Remote registry . 43
5.4.2.4 Loop back gate . 43
5.4.2.4.1 Conformance requirements . 43
5.4.3 Generic gates . 43
5.5 HCI procedures . 44
5.5.1 Pipe management . 44
5.5.1.1 Pipe creation . 44
5.5.1.1.1 Conformance requirements . 44
5.5.1.2 Pipe deletion . 44
5.5.1.2.1 Conformance requirements . 44
5.5.1.2.2 Test case 1: valid pipe deletion from host to host controller . 45
5.5.1.3 Clear all Pipes . 45
5.5.1.3.1 Conformance requirements . 45
5.5.1.3.2 Test case 1: identity reference data when ETSI TS 102 613 is used . 45
5.5.1.3.3 Test case 2: reception of ADM_CLEAR_ALL_PIPE - static pipes, dynamic pipes to host . 46
5.5.2 Registry access . 47
5.5.3 Host and Gate discovery . 47
5.5.4 Session initialization . 47
5.5.4.1 Conformance requirements . 47
5.5.4.2 Test case 1: inhibited state . 47
5.5.4.2.1 Test execution . 47
5.5.4.2.2 Initial conditions . 47
5.5.4.2.3 Test procedure . 47
5.5.4.3 Test case 2: inhibited state, followed by subsequent successful identity check . 48
5.5.4.3.1 Test execution . 48
5.5.4.3.2 Initial conditions . 48
5.5.4.3.3 Test procedure . 49
5.5.4.4 Test case 3: initialization using all defined gates . 49
5.5.4.4.1 Test execution . 49
5.5.4.4.2 Initial conditions . 49
5.5.4.4.3 Test procedure . 49
5.5.5 Loop back testing . 52
5.5.5.1 Conformance requirements . 52
5.5.5.2 Test case 1: processing of EVT_POST_DATA . 52
5.5.5.2.1 Test execution . 52
5.5.5.2.2 Initial conditions . 52
5.5.5.2.3 Test procedure . 52
5.6 Contactless card emulation . 52
5.6.1 Overview . 52
5.6.1.1 Conformance requirements . 52
5.6.1.2 Test case 1: RF gate of type A . 53
5.6.1.2.1 Test execution . 53
5.6.1.2.2 Initial conditions . 53
5.6.1.2.3 Test procedure . 53
5.6.1.3 Test case 2: RF gate of type B. 53
5.6.1.3.1 Test execution . 53
5.6.1.3.2 Initial conditions . 53
5.6.1.3.3 Test procedure . 53
5.6.1.4 Test case 3: RF gate of type F . 54
5.6.1.4.1 Test execution . 54
5.6.1.4.2 Initial conditions . 54
5.6.1.4.3 Test procedure . 54
5.6.2 Void . 54
5.6.3 Gates . 55
5.6.3.1 Void. 55
5.6.3.2 Identity management gate . 55
5.6.3.2.1 Conformance requirements . 55
5.6.3.3 Card RF gates . 55
5.6.3.3.1 Overview .
...

  • Relates Information
  • ISO 8130-9:1992

    ISO 8130-9:1992 - Coating powders
    09-28
  • EN 352-2:2020/FprA1

    EN 352-2:2021/oprA1:2023
    09-28
  • IEC TS 61158-4:1999

    IEC TS 61158-4:1999 - Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 4: Data Link protocol specification Released:3/24/1999 Isbn:2831847656
    09-28
  • HD 566 S1:1990

    HD 566 S1:1998
    09-28
  • ISO 5131:1982/Amd 1:1992

    ISO 5131:1982/Amd 1:1992
    09-28
  • EN 60598-2-22:1990

    EN 60598-2-22:1996
    09-27
  • ISO 8504-2:1992

    ISO 8504-2:1992 - Preparation of steel substrates before application of paints and related products -- Surface preparation methods
    09-27
  • EN 12165:2024

    prEN 12165:2022
    09-27
  • IEC TS 61158-6:1999

    IEC TS 61158-6:1999 - Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 6: Application Layer protocol specification Released:3/24/1999 Isbn:2831847613
    09-27
  • ISO 4252:1992

    ISO 4252:1992 - Agricultural tractors -- Operator's workplace, access and exit -- Dimensions
    09-27