Bitumenske zmesi - Preskusne metode - 3. del: Ugotavljanje deleža veziva:
rotacijski uparjalnik
Bituminous mixtures - Test methods - Part 3: Bitumen recovery: Rotary evaporator
Asphalt - Prüfverfahren - Teil 3: Rückgewinnung des Bindemittels: Rotationsverdampfer
Mélanges Bitumineux - Méthodes d’essai - Partie 3 : Extraction des bitumes à
l’évaporateur rotatif
Ta slovenski standard je istoveten z: EN 12697-3:2013/prA1
ICS:
93.080.20 Materiali za gradnjo cest Road construction materials
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
DRAFT
EUROPEAN STANDARD
EN 12697-3:2013
NORME EUROPÉENNE
EUROPÄISCHE NORM
prA1
September 2017
ICS 93.080.20
English Version
Bituminous mixtures - Test methods - Part 3: Bitumen
recovery: Rotary evaporator
This draft amendment is submitted to CEN members for enquiry. It has been drawn up by the Technical Committee CEN/TC 227.
This draft amendment A1, if approved, will modify the European Standard EN 12697-3:2013. If this draft becomes an
amendment, CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for
inclusion of this amendment into the relevant national standard without any alteration.
This draft amendment was established by CEN in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CEN member into its own language and notified to the CEN-CENELEC
Management Centre has the same status as the official versions.
CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia,
Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania,
Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden, Switzerland,
Turkey and United Kingdom.
Recipients of this draft are invited to submit, with their comments, notification of any relevant patent rights of which they are
aware and to provide supporting documentation.
Warning : This document is not a European Standard. It is distributed for review and comments. It is subject to change without
notice and shall not be referred to as a European Standard.
EUROPEAN COMMITTEE FOR STANDARDIZATION
COMITÉ EUROPÉEN DE NORMALISATION
EUROPÄISCHES KOMITEE FÜR NORMUNG
CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels
© 2017 CEN All rights of exploitation in any form and by any means reserved Ref. No. EN 12697-3:2013/prA1:2017 E
worldwide for CEN national Members.
EN 12697-3:2013/prA1:2017 (E)
Contents Page
European foreword . 3
1 Modification to the Title . 4
2 Modification to 5.1, Apparatus for the extraction of the soluble bitumen . 4
3 Modification to 7.1, Extraction of the bitumen and removal of insoluble matter . 4
4 Modification to 7.3, Distillation procedure. 4
5 Modification to Clause 9, Test report . 6
EN 12697-3:2013/prA1:2017 (E)
European foreword
This document (EN 12697-3:2013/prA1:2017) has been prepared by Technical Committee CEN/TC 227
“Road materials”, the secretariat of which is held by DIN.
This document is currently submitted to the CEN Enquiry.
EN 12697-3:2013/prA1:2017 (E)
1 Modification to the Title
Replace the title:
“Bituminous mixtures - Test methods for hot mix asphalt - Part 3: Bitumen recovery: Rotary evaporator”
with:
“Bituminous mixtures - Test methods - Part 3: Bitumen recovery: Rotary evaporator”.
2 Modification to 5.1, Apparatus for the extraction of the soluble bitumen
Replace the NOTE with the following one:
“
NOTE The use of the hot extraction methods in EN 12697-1 may harden the binder and hence affect the
results from subsequent tests.”.
3 Modification to 7.1, Extraction of the bitumen and removal of insoluble matter
In the numbered entry 7.1.2, replace:
"
7.1.2 Allow the bitumen solution to stand for a minimum of 10 min, and pour out the bitumen
solution through a 0,063 mm sieve to remove any insoluble material. This can be achieved by either a)
or b)."
with:
"
7.1.2 Allow the bitumen solution to stand for a minimum of 10 min, and pour out the bitumen
solution through a 0,063 mm sieve to remove any insoluble material retained on this sieve. Removal of
insoluble material passing a 0,063 mm sieve can be achieved by either
...