prEN 15383

Plastics piping systems for drainage and sewerage - Glass-reinforced thermosetting plastics (GRP) based on polyester resin (UP) - Manholes and inspection chambers

prEN 15383

Name:prEN 15383   Standard name:Plastics piping systems for drainage and sewerage - Glass-reinforced thermosetting plastics (GRP) based on polyester resin (UP) - Manholes and inspection chambers
Standard number:prEN 15383   language:English language
Release Date:   technical committee:CEN/TC 155 - Plastics piping systems and ducting systems
Drafting committee:CEN/TC 155/WG 14 - Systems of glass-reinforced thermosetting plastics for all applications - Polyester, epoxy and polyester resin based concrete   ICS number:
SLOVENSKI oSIST prEN 15383:2005

PREDSTANDARD
december 2005
Cevni sistemi iz polimernih materialov za odpadno vodo – S steklenimi vlakni
okrepljeni duromerni materiali (GRP), ki temeljijo na nenasičeni poliestrski
smoli (UP) – Vstopni in revizijski jaški
Plastics piping systems for drainage and sewerage - Glass-reinforced
thermosetting plastics (GRP) based on polyester resin (UP) - Manholes and
inspection chambers
ICS 23.040.20; 91.140.80 Referenčna številka
oSIST prEN 15383:2005(en)
©  Standard je založil in izdal Slovenski inštitut za standardizacijo. Razmnoževanje ali kopiranje celote ali delov tega dokumenta ni dovoljeno

---------------------- Page: 1 ----------------------
EUROPEAN STANDARD
DRAFT
prEN 15383
NORME EUROPÉENNE
EUROPÄISCHE NORM
October 2005
ICS

English Version
Plastics piping systems for drainage and sewerage - Glass-
reinforced thermosetting plastics (GRP) based on polyester
resin (UP) - Manholes and inspection chambers
Systèmes de canalisations en plastiques pour les
branchements et collecteurs d'assainissement - Plastiques
thermodurcissables renforcés de verre (PRV) à base de
résine de polyester (UP) - Regards et boîtes d'inspection et
de branchement
This draft European Standard is submitted to CEN members for enquiry. It has been drawn up by the Technical Committee CEN/TC 155.
If this draft becomes a European Standard, CEN members are bound to comply with the CEN/CENELEC Internal Regulations which
stipulate the conditions for giving this European Standard the status of a national standard without any alteration.
This draft European Standard was established by CEN in three official versions (English, French, German). A version in any other language
made by translation under the responsibility of a CEN member into its own language and notified to the Management Centre has the same
status as the official versions.
CEN members are the national standards bodies of Austria, Belgium, Cyprus, Czech Republic, Denmark, Estonia, Finland, France,
Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Slovakia,
Slovenia, Spain, Sweden, Switzerland and United Kingdom.
Recipients of this draft are invited to submit, with their comments, notification of any relevant patent rights of which they are aware and to
provide supporting documentation.
Warning : This document is not a European Standard. It is distributed for review and comments. It is subject to change without notice and
shall not be referred to as a European Standard.
EUROPEAN COMMITTEE FOR STANDARDIZATION
COMITÉ EUROPÉEN DE NORMALISATION
EUROPÄISCHES KOMITEE FÜR NORMUNG
Management Centre: rue de Stassart, 36  B-1050 Brussels
© 2005 CEN All rights of exploitation in any form and by any means reserved Ref. No. prEN 15383:2005: E
worldwide for CEN national Members.

---------------------- Page: 2 ----------------------
prEN 15383:2005 (E)
Contents
Foreword. 4
Introduction . 4
1 Scope. 5
2 Normative references . 5
3 Terms and definitions. 6
3.1 Manholes and inspection chambers . 6
3.2 Prefabricated unit. 8
3.3 Components of the base unit.10
3.4 Component of the side entry manhole or inspection chamber . 11
3.5 Units forming the capping structure . 11
3.6 Slabs and other elements used as reducing unit. 12
3.7 Sizes and nominal values . 12
3.8 Performance. 13
3.9 Other . 14
4 Symbols . 15
5 Classification. 17
6 Place of installation . 17
7 Material specification and properties . 18
7.1 Chamber and shaft units. 18
7.2 Pipes, fittings and supporting material. 19
7.3 Benching and invert . 19
7.4 Slabs and adjusting unit. 20
7.5 Manhole top . 20
7.6 Joints. 20
7.7 Manhole steps and ladders. 20
8 Types of manholes and inspection chambers. 20
9 General characteristics . 26
9.1 National design and safety regulations. 26
9.2 General composition . 26
9.3 Serviceability and durability . 26
9.4 Design service temperature . 26
9.5 General appearance and finish. 26
9.6 Flexible connection . 27
9.7 Test conditions. 27
10 Geometrical characteristics. 27
10.1 General . 27
10.2 Vertical cylindrical components. 27
10.3 Geometry of cylindrical components. 30
10.4 Slabs . 30
10.5 Connections . 31
10.6 Benching and inverts in base units . 31
10.7 Manhole steps and ladders. 32
2

---------------------- Page: 3 ----------------------
prEN 15383:2005 (E)
11 Mechanical characteristic requirements .32
12 Performance requirements .34
13 Conformity evaluation.36
13.1 General .36
13.2 Product evaluation procedures.36
14 Marking .36
Annex A (informative) Guidance for the assessment of conformity.38
A.1 GRP components .38
A.2 Non-GRP components.41
Annex B (normative) Test method for connections to sewer.42
B.1 Scope.42
B.2 Connection using an integrated pipe element .42
B.3 Connections using an integrated pipe coupling.42
Annex C (normative) Negative pressure test on units .44
C.1 Scope.44
C.2 Principle .44
C.3 Apparatus .44
C.4 Test pieces .44
C.5 Procedure .45
Annex D (informative) Test method for gas-tightness of inspection chambers and manholes 46
D.1 Scope.46
D.2 Principle .46
D.3 Apparatus .46
D.4 Test pieces .46
D.5 Procedure .47
Annex E (normative) Initial specific longitudinal compressive strength – Test method.48
E.1 Scope.48
E.2 Number of the test pieces.48
E.3 Dimension of the test pieces .48
E.4 Test.49
E.5 Test report .49
Annex ZA (informative) Clauses of this European Standard addressing the provisions of the EU
Construction Products Directive .50
ZA.1 Scope and relevant characteristics.50
ZA.2 Procedure(s) for the attestation of conformity of GRP manholes and inspection chambers. .51
ZA.3 CE marking and labeling.53
Bibliography.55

3

---------------------- Page: 4 ----------------------
prEN 15383:2005 (E)
Foreword
This document (prEN 15383:2005) has been prepared by Technical Committee CEN/TC 155 "Plastics piping
systems and ducting systems", the secretariat of which is held by NEN.
This document is currently submitted to the CEN Enquiry.
This European Standard is a System Standard for manholes and inspection chambers made of plastics piping
systems using glass-reinforced thermosetting plastics (GRP) based on unsaturated polyester resin (UP), for
drainage and sewerage. This European Standard has been prepared under a mandate given to CEN by the
European Commission and the European Free Trade Association, and supports essential requirements of EU
Directive(s).
For relationship with EU Directive(s), see informative annex ZA, which is an integral part of this document.
This European Standard includes three informative and three normative annexes:
 ANNEX A: Guidance for the assessment of conformity (informative);
 ANNEX B: Test method for connections to sewer (normative);
 ANNEX C: Negative pressure test on units (normative);
 ANNEX D: Test method for gas-tightness of inspection chambers and manholes (informative);
 ANNEX E: Initial specific longitudinal compressive strength – test method (normative);
 ANNEX ZA: Clauses of this European Standard addressing the provisions of the EU Construction
Products Directive (informative).
[1]
NOTE Separate ENV standard prCEN/TS 14632 , extended with annex A, covers the assessment of conformity.

Introduction
The performance of a sewerage network constructed with these products depends not only on the properties
of the product as required by this standard but also on the design and construction of the network as a whole
in relation to the environment and conditions of use.
4

---------------------- Page: 5 ----------------------
prEN 15383:2005 (E)
1 Scope
This standard specifies the requirements for GRP-UP manholes and inspection chambers, with circular
chamber and shaft sections, for use within a drain or sewer system under gravity or at low head of pressure,
limited by non-pressure classification as defined in Clause 3.
This European standard covers components to be used in systems for the conveyance of one or more of the
following fluids:
 domestic wastewater;
 surface water;
 other waste waters (e.g. trade effluent).
Products covered by this standard are either complete manholes and inspection chambers or individual units
for the construction of manholes and inspection chambers, with an intended use in buried applications.
It specifies definitions, material specification and properties, types, characteristics, requirements, test methods,
marking.
NOTE Complete manholes or prefabricated units can also be used for other purposes such as pumping stations,
manholes for pipeline-equipment, backdrop manholes, ramp manholes, combined sewer overflow, storm water overflow,
items of drainage, housings for waste water treatment systems, items for sewerage treatment or sewerage disposal, when
corresponding additional requirements according to the relevant European Standards are fulfilled. If used in drinking water
systems, the requirements of the relevant standards for products in contact with drinking water shall apply to the
components in contact with drinking water.
2 Normative references
The following referenced documents are indispensable for the application of this document. For dated
references, only the edition cited applies. For undated references, the latest edition of the referenced
document (including any amendments) applies.
EN 124:1994, Gully tops and manhole tops for vehicular and pedestrian areas — Design requirements, type
testing, marking, quality control.
EN 295-1, Vitrified clay pipes and fittings and pipe joints for drains and sewers — Part 1: Requirements.
EN 476:1997, General requirements for components used in discharge pipes, drains and sewers for gravity
systems.
EN 545, Ductile iron pipes, fittings, accessories and their joints for water supply — Requirements and test
methods.
EN 598, Ductile iron pipes, fittings, accessories and their joints for sewerage application — Requirements and
test methods.
EN 1119, Plastics piping systems — Joints for glass-reinforced thermosetting plastics (GRP) pipes and
fittings — Test methods for leak tightness and resistance to damage of flexible and reduced-articulation joints.
EN 1120, Plastics piping systems — Glass-reinforced thermosetting plastics (GRP) pipes and fittings —
Determination of the resistance to chemical attack from the inside of a section in a deflected condition.
EN 1228, Plastics piping systems — Glass-reinforced thermosetting plastics (GRP) pipes — Determination of
initial specific ring stiffness.
5

---------------------- Page: 6 ----------------------
prEN 15383:2005 (E)
EN 1394, Plastics piping systems — Glass-reinforced thermosetting plastics (GRP) pipes — Determination of
the apparent initial circumferential tensile strength.
EN 1610:1997, Construction and testing of drains and sewers.
EN 1916, Concrete pipes and fitting, unreinforced, steel fibre and reinforced.
EN 1997:2002, Concrete manholes and inspection chambers, unreinforced, steel fibre and reinforced.
EN 13101, Steps for underground man entry chambers — Requirements, marking, testing and evaluation of
conformity.
prEN 14364:2002, Plastics piping systems for drainage and sewerage with or without pressure — Glass-
reinforced thermosetting plastics (GRP) based on unsaturated polyester resin (UP).
EN 14396, Fixed ladders for manholes.
EN ISO 604, Plastics — Determination of compressive properties (ISO 604:2002).
EN ISO 3126, Plastics piping systems — Plastics components — Determination of dimensions
(ISO 3126:2005).
EN ISO 14125, Fibre-reinforced plastic composites — Determination of flexural properties (ISO 14125:1998).
3 Terms and definitions
For the purposes of this European standard, the following term, definitions and abbreviations apply.
3.1 Manholes and inspection chambers
3.1.1
manhole
drainage and sewerage fitting which is used for connecting drainage or sewerage installations and/or for
changing the direction and/or level of drainage/sewerage runs. A manhole terminates at ground level, which
permits the introduction of cleaning, inspection and test equipment and the removal of debris and it provides
access for personnel
3.1.2
inspection chamber
drainage and sewerage fitting as a manhole, but it does not provide access for personnel
3.1.3
unit
prefabricated structure, ready for assembling with other units on the construction site and forming the
complete manhole or inspection chamber
3.1.4
component
part of a unit and is always factory assembled to form the unit
3.1.5
fitting
part of a drain or sewer system other than pipes
6

---------------------- Page: 7 ----------------------
prEN 15383:2005 (E)
3.1.6
closed access fitting
manhole or inspection chamber that permits entry into the system for rodding or inspection and that has a
sealed cover
3.1.7
saddle
fitting that enables a branch connection to be made in buried drainage/sewerage systems of larger diameter
by cutting a hole in the pipe and is retained in position by lamination or glue
3.1.8
rodding point
component of an inspection chamber installed at ground level and fitted with a removable cover that permits
the introduction of equipment for inspection and the clearance of blockages
3.1.9
rodding tee
component of an inspection chamber installed in a drainage or sewerage system that connects to a rodding
point at ground level by means of a vertical shaft that permits the introduction of equipment for the clearance
of blockages, and also equipment for the inspection of the connecting pipe work in one or more directions
3.1.10
backdrop manhole
manhole with a connection, by means of a vertical pipe, at or just above invert, from a drain or sewer at a
higher level
7

---------------------- Page: 8 ----------------------
prEN 15383:2005 (E)
3.2 Prefabricated unit

Key
A is the adjusting unit
B is the base unit
C is the cover slab
D is the chamber unit
R is the reducing slab
S is the shaft unit
T is the cone
U is the side entry manhole or inspection chamber
Figure 1 — Typical structures
3.2.1
chamber
space with maximum diameter, inside a manhole or an inspection chamber, limited by base unit, the cover or
reducing slab or cone and the chamber unit
3.2.2
shaft
space above the chamber inside a manhole or an inspection chamber, with uniform diameter smaller than the
chamber, limited by the cover slab or cone and the shaft unit
3.2.3
base unit (see Figure 1 – unit B)
bottom section in a manhole, with or without benching, in which connections to the drain or sewer system, with
or without changes in direction and/or level occur
8

---------------------- Page: 9 ----------------------
prEN 15383:2005 (E)
3.2.4
chamber unit (see Figure 1– unit D)
vertical hollow component of uniform cross-section. Flexible joints to accommodate connecting pipelines may
be provided as for a base unit
3.2.5
landing slab
intermediate floor in the form of a slab built between the different ladders for reasons of safety and which has
suitable means of connection the adjacent chamber units
3.2.6
side entry manhole or inspection chamber (see Figure 1 – unit U)
sewer pipe or fitting on which a centric or tangential saddle component is fixed for the connection to the
chamber unit, shaft unit or to the capping structure
3.2.7
shaft unit (see Figure 1 – unit S)
section providing access to the chamber in deep manholes
3.2.8
capping structure
structure on top of base unit, chamber unit or shaft unit composed of:
 a manhole top, conforming to EN 124:1994 or with national safety regulations;
 adjusting unit (see Figure 1 – unit A), compatible with the cone or cover slab and with the manhole top
and secured against horizontal displacement;
 a cone (see Figure 1 – unit T) or a cover slab (see Figure 1 – unit C), compatible with the base unit,
chamber unit or shaft unit and secured against horizontal displacement
3.2.9
reducing unit
cone (see Figure 1 – unit T) or reducing slab (see Figure 1 – unit R).
3.2.10
prefabricated complete manhole or inspection chamber
manhole or inspection chamber assembled on the construction site, with all required units from bottom to
cover slab, ready for fitting into the sewerage system. Jointing material between units shall be supplied by the
manufacturer of prefabricated manhole or inspection chamber
9

---------------------- Page: 10 ----------------------
prEN 15383:2005 (E)
3.3 Components of the base unit

Key
1 is the benching
2 is the invert
3 is the base slab
Figure 2 — Base Unit
3.3.1
base slab (see Figure 2 – item 1)
component forming the bottom of the chamber
3.3.2
invert (see Figure 2 – item 2)
lowest point of the internal surface of the benching in the base unit of the manhole and inspection chamber
between sewer connections
3.3.3
benching (see Figure 2 – item 3)
smooth surface forming the bottom of the base unit
3.3.4
connection to sewer (see Figure 8)
short length of pipe or a joint fitting, ready to connect sewer pipes and which is securely fixed into the wall of a
chamber or the shaft unit
10

---------------------- Page: 11 ----------------------
prEN 15383:2005 (E)
3.4 Component of the side entry manhole or inspection chamber

Key
4 is the saddle element
d is the external diameter (see 3.7.1)
e
h is the height of saddle element, expressed in millimetre (mm)

up
h is the effective height of connecting ring, expressed in millimetre (mm)

cr
Figure 3 — Side entry manhole or inspection chamber
3.4.1
saddle element (see Figure 3 – item 4)
piece of chamber, shaft or a coupling, fixed on the pipe, and making the connection with the chamber unit or
shaft unit
3.5 Units forming the capping structure

Key:
G.L. is the ground level
5 is the adjusting unit
6 is the manhole top
7 is the cover slab
Figure 4 — Capping structure
3.5.1
adjusting unit (see Figure 4 – item 5)
component situated above the cover slab, without a joint or installed step, to adjust the total height of a
structure and/or to accommodate an appropriate frame and cover
3.5.2
manhole top (see Figure 4 – item 6)
part of a manhole and inspection chamber, consisting of a frame and a cover and/or a grating. It provides a
load bearing closure to a manhole
11

---------------------- Page: 12 ----------------------
prEN 15383:2005 (E)
3.5.2.1
cover
movable part(s) of a manhole-top which cover(s) the manhole or inspection chamber
3.5.2.2
grating
movable part(s) of a manhole-top which permits the passage of water through itself to the manhole or
inspection chamber
3.5.2.3
frame
fixed part of a manhole-top, which receives and supports a grating and/or a cover
3.6 Slabs and other elements used as reducing unit
3.6.1
reducing slab (see Figure 1 – unit R)
unit that provides a connection between the chamber unit and shaft unit with an opening for access and
suitable means of connection to the adjacent units. The opening is located eccentrically or concentrically
3.6.2
cover slab (see Figure 1 – unit C and Figure 4 – item 7)
unit forming the horizontal roof of a manhole or inspection chamber, having an access opening, situated
immediately under the manhole-top or adjusting ring, and having suitable means of connection to the adjacent
units. The opening is located eccentrically or concentrically
3.6.3
load-transmitting slab (see Figure 14)
slab that transmits the traffic and other superimposed loads, applied on the slab, to the load bearing chamber.
This slab is usual designed as a cover slab
3.6.4
load-distributing slab (see Figure 15, Figure 16 and Figure 17)
slab that distributes the traffic and other superimposed loads, applied to the slab, to the surrounding soil
thereby avoiding loading the shaft unit or chamber unit
3.6.5
cone (see Figure 1 – item T)
shaft ring with variable section. It forms the sloping roof of a circular base unit or shaft unit, thereby reducing
this unit to the size of the shaft unit or the shaft neck. It can be eccentric or concentric. Such unit shall be
provided with appropriate means for connection to the adjoining units
3.6.6
shaft neck
cylindrical part connected on the upper part of a cone
3.7 Sizes and nominal values
3.7.1
external diameter
d
e
mean external diameter of the pipe barrel at any cross section, expressed in millimetres (mm)
3.7.2
internal diameter
12

---------------------- Page: 13 ----------------------
prEN 15383:2005 (E)
d
i
external diameter minus twice the wall thickness [see equation (1)], expressed in millimetres (mm)
d = d – 2 × e …(1)

i e
where:
d is the external diameter, expressed in millimetres (mm);
e
e is the wall thickness of the pipe, expressed in millimetres (mm)
3.7.3
nominal size
DN
alphanumerical designation of size of component, which is a convenient integer approximately equal to a
manufacturing dimension in mm. This can apply to either the internal diameter (DN/ID) or the external
diameter (DN/OD), when expressed in millimetres
NOTE The designation for reference or marking purposes consists of the letters DN plus a number.
3.7.4
nominal stiffness
SN
alphanumeric designation for stiffness classification purposes, which has the same numerical value as the
minimum initial specific ring stiffness value required as determined in prEN 14364:2002, when expressed in
2
newtons per square meter (N/m )
NOTE The designation for reference or marking purposes consists of the letters SN plus a number.
3.7.5
nominal pressure
PN
alphanumeric designation for pr
...

  • Relates Information
  • ISO 8130-9:1992

    ISO 8130-9:1992 - Coating powders
    09-28
  • EN 352-2:2020/FprA1

    EN 352-2:2021/oprA1:2023
    09-28
  • IEC TS 61158-4:1999

    IEC TS 61158-4:1999 - Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 4: Data Link protocol specification Released:3/24/1999 Isbn:2831847656
    09-28
  • HD 566 S1:1990

    HD 566 S1:1998
    09-28
  • ISO 5131:1982/Amd 1:1992

    ISO 5131:1982/Amd 1:1992
    09-28
  • EN 60598-2-22:1990

    EN 60598-2-22:1996
    09-27
  • ISO 8504-2:1992

    ISO 8504-2:1992 - Preparation of steel substrates before application of paints and related products -- Surface preparation methods
    09-27
  • EN 12165:2024

    prEN 12165:2022
    09-27
  • IEC TS 61158-6:1999

    IEC TS 61158-6:1999 - Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 6: Application Layer protocol specification Released:3/24/1999 Isbn:2831847613
    09-27
  • ISO 4252:1992

    ISO 4252:1992 - Agricultural tractors -- Operator's workplace, access and exit -- Dimensions
    09-27