Lingang production base project of Siemens Wind Power Blades (Shanghai) Co., Ltd. is located in Lot I0204-A, Heavy Equipment Park, Lingang Economic Development Zone, along Miaoxiang Road, South Side, Jiangshan Road. on the north side and Shanghai north of Jiangshan Road Land used by China-Hong Kong Yangshan Logistics Equipment Co., Ltd. The total area of the project is approximately 177,000 m2.
The project provides for the construction of two new factories. The complete factory building on the north side includes fiberglass cutting and blade molding workshops, auxiliary equipment rooms and offices, and space is reserved for the engine. room factory. The south side of the factory building is a blade machine shop, including repair, sandblasting, painting and other processes, with part of the space reserved for the nacelle factory.
The products of this project are blades (B45) forwind power generation equipment, with an annual production of 500 MW (each equipment produced in this project is 2.3 MW, with 3 blades. Calculate the annual blade production capacity of this project on this basis is 652 pieces).
This project requires 250 employees, implements a three-shift work system and has an annual working day of 250 days. The project represents a total investment of 64 million euros and should be put into production by the end of 2010.