Project information sheet

Introduction Project Information Table The project information table of the Geology and Mineral Drilling Database is shown in Table 2.3. Table 2.3 Geological and Mineral Drilling Database Project Information Table (continued) Table 2.3 is used to record project relate

Project information sheet

The project information table of the geological and mineral drilling database is shown in Table 2.3.

Table 2.3 Geological and Mineral Drilling Database Project Information Table

Table continued

Table 2.3 is used to record the information relating to the project. The description of the data items is as follows:

(1) Project name: designates the name of the geological work project carried out in the mining area or exploration area.

(2) Project number: 20 digits KKK HH ZZZZZZZZZ LL XXXX, represented by 0 to 9 characters.

KKK represents the 3-digit extension code, fill in the character "000".

HH represents the 2-digit geological industry code.

ZZZZZZZZZZ represents the 9-digit organizational code. Fill in the organizational code of the geological drilling data storage unit.

LL represents category code de 2-digit geological works, which must be completed according to the geological works category code.

XXXX represents the 4-digit project serial number code and the encoding rule is "0001 - 9999".

For example, 000 01 400015276 02 0001

The result is saved in the database, 00001400015276020001

Geological industry code

01 Geology Department of Metallurgy and Mining 02 Department of Metallurgy 03 Department of Non-Ferrous Metals 04 Department of Coal

05 Department of Gold 06 Department of Building Materials 07 Department of 'Nuclear Industry 08 Other Departments

Geological Work Category Code

< p>01 Regional geological study 02 Regional mineral study 03 Regional hydraulic environmental study 04 Marine geological study

05 Mineral geological study 06 Hydrogeological study 07 Geological study of coal fields 08 Engineering geological study

09 Oil and gas geological studies 10 Urban geological exploration 11 Environmental geological exploration 12 Disaster geological exploration

13 Geological scientific research 14 Other geological explorations

(3) Project start date: refers to the date the project starts and the format is YYYY - MM - DD, you can check the self-assessment.

(4) Project End Date: Refers to the end date of the project. The format is YYYY - MM - DD, which can be checked in the self-assessment.

(5) Project supervision unit: designates the full name of the unit that issued the project, up to 30 Chinese characters.

(6) Geographic location of the project: means the straight line distance between the mining area and towns, main transportation lines, stations and wharves, as well as the names of transportation points and associated transport lines, described in Chinese characters.

(7) Administrative district name: refers to the name of the administrative district where the mining area is located. The Chinese character name can be populated according to the location and transportation of the mining area in the report. .

(8) Responsible Unit: Refers to the full name of the unit carrying out the project's research work.

(9) Responsible unit: designates the name of the person in charge of the responsible unit.

(10) Chief Engineer: means the name of the chief engineer of the responsible unit.

(11) Project manager: Refers to the name of the person in charge of the project.

(12) Technical Manager: Refers to the name of the technical person in charge of the project.

(13) Postal address: designates the postal address of the unit carrying the project.

(14) Postal code: designates the postal code of the area where the unit carrying the project is located.

(15) Contact person: designates the name of the contact person of the probject or storage unit for current drilling data.

(16) Contact Number: means the contact number of the current project or drilling data storage unit.

(17) Email: refers to the email of the current project or drilling data storage unit. Now for the unit, fill in the name in Chinese characters.

(18) Category of works: refers to the category of geological works to which the project belongs. Fill in the name in Chinese characters: including regional geological survey, regional mineral survey, regional hydraulic environmental survey, urban geological survey, marine geological survey and mineral exploration, hydrogeological survey, geological environmental hazard survey, geological survey of coalfields, geological survey of oil and gas, geological scientific research and others.

(19) Work step: Fill in the Chinese character names directorytoried under GB/T 9649-2001 PKD, divided into field survey, regional geological survey, mineral exploration, general survey, detailed survey, exploration, preliminary survey, detailed census, preliminary exploration, detailed exploration, mining development and exploration, see GB/T 9649 “Geological and Mineral Terminology Classification Code”.

(20) Project coordinates: determined by four points, expressed in degrees, minutes and seconds, and entered in the order of the coordinate points. Such as: 36°23'17″, 36°34'30″, 114°15'10″, 114°21'00″.

(21) Mineral deposit type: refers to the genetic type of the main mineral species in the mineral area based on mineralization. Fill in the name in Chinese characters as shown under GB/T 9649KCBA.

(22) Major Minerals: Refers to the major minerals observed in the borehole. Fill in the 4 main mineral names according to the names of cChinese characters listed under GB/T 9649 KCC.

(23) Associated Minerals: Refers to a type of mineral as the primary mineral, along with other useful mineral components. For example, copper deposits are dominated by copper, accompanied by gold, silver, etc. Associated minerals complement the recyclable minerals. According to the Chinese character names listed under GB/T 9649 KCC, indicate up to 4 mineral names, separated by half-width "," symbols.

(24) Total number of boreholes: refers to the total number of boreholes drilled as part of this project.

(25) Number of boreholes for database construction: refers to the number of boreholes selected to collect data for database construction.

(26) Data sources for database construction: refers to data sources collected for database construction, such as results reports,borehole histograms, original data, etc.

(27) Original data medium: designates the type of medium on which the original data is stored, enter “electronic medium” or “paper medium”.

(28) Unit where the data is located: Fill in the name in Chinese characters of the unit that stores the drilling data.

(29) Name of the results report: Fill in the full Chinese character name of the geological results report.

(30) Results Storage Unit: Refers to the unit where the report and data are located. Fill in the full unit name in Chinese characters.

(31) Cataloguer: means the name of the person who completes the project form.

(32) Catalog Date: Refers to the specific date when filling out the project form, for example 2009-12-13.

  • Popular Focus
  • Where is the cheapest battery wholesale?

    Where is the cheapest battery wholesale in Tangxia, Sanyuanli, Baiyun District? There is an enterprise specializing in the independent production of electric vehicles in Tangxia, Sanyuanli, Baiyun District, Baiyun Sanyuanli Avenue, Baiyun Sanyuanli Street
    08-02
  • Understanding 18650 Voltage: A Comprehensive Guide to Lithium-Ion Battery Power

    Lithium-ion batteries have become the backbone of modern portable electronics, providing the energy needed for everything from smartphones to electric vehicles. Among the various types of lithium-ion batteries, the 18650 battery stands out as a popular ch
    08-27
  • What are the materials of the negative electrodes of lithium batteries?

    What are the materials of the negative electrodes of lithium batteries? The main commercial applications of lithium batteries include graphite, which is a sheet of copper used to guide current and which does not react. another safe
    08-02
  • The difference between 18500 and 26500 batteries

    What is the difference between 18500 and 26500 batteries? The answer above is 18650. The person asking the question should ask what is the difference between 18505 and 26500 batteries. In the case of Fuant ER1
    08-02
  • What does 3.7V 80mAh written on a lithium battery mean?

    What does 3.7V 80mAh written on a lithium battery mean? 3.7 V, 80 mA = 0.08 A, H means 1 hour, or 3600 seconds. Taken together, it is
    08-02
  • How long does a lithium battery (cell phone battery) last?

    How long does a lithium battery (cell phone battery) last? The lifespan of mobile phone batteries, under normal conditions of use and without serious impact, the lifespan set by the manufacturer must be 5 years.
    08-02
  • Will lithium batteries explode when charging?

    Will lithium batteries explode when charged? Will lithium batteries explode when charged? Lithium battery explosions usually occur during the charging process, because the negative electrode material of lithium batteries is graphite or other carbon materi
    08-02
  • Parameters of lgdas31865 lithium battery

    Parameters of lgdas31865 lithium battery The parameters of lgdas31865 lithium battery are as follows: LGDAS31865 is a model 18650 lithium battery with a capacity of
    08-02
  • What are the main components of lithium battery electrolyte?

    What are the main components of lithium battery electrolyte? The composition of lithium battery electrolyte is shown below. 1. Ethylene carbonate: molecular formula C3H4O3. Colorless transparent liquid (>35℃), room temperature
    08-02
  • Who are the lithium battery manufacturers in Shandong?

    What are the lithium battery manufacturers in Shandong? Shandong Shengyang Power Supply Co., Ltd. and Shandong Weineng Environmental Protection Power Technology Co., Ltd. 1. Shandong Shengyang Power Supply Co., Ltd. is located in Shengyang, Qufu City.
    08-02
  • Types of drone batteries available in 2024

    Part 1. Types of drone batteries available in 2024In 2024, drone batteries have advanced significantly, offering a range of options to cater to various needs in
    07-30
  • How long does it take to charge 26650 battery?

    How long does it take to charge a 26650 battery? The charging time for a 26650 battery is generally between 3 and 6 hours, but the precise time depends on the power of the charger and the capacity of the battery. in general
    08-02
  • For what?Sure, here's an article based on the phrase "For what?

    The simple yet profound question, "For what?" often serves as a gateway to deeper reflections on purpose and intention. It is a query that invites us to delve into the reasons behind actions, decisions, and circumstances that shape our lives and the wor
    08-02
  • Choosing the Right Cart Battery

    This comprehensive guide will walk you through everything you need about cart batteries, from understanding different types to making an informed purchase decision.
    08-02
  • 30mAh~500mAh 3.7 V Li-ion Battery

    Welcome to Ufine's collection of 3.7V lithium-ion batteries ranging from 30mAh to 500mAh. Explore a diverse range of compact and lightweight batteries suitable for various electronic devices,
    08-02
  • Here are 10 essential facts about drone batteries for 2024.

    10 Key Facts About Drone Battery for 2024 In 2024, drone batteries have advanced significantly, offering a range of options to cater to various needs in the consumer, commercial, and industrial sectors. Below are the primary types of drone batteries avai
    08-02
  • Could you please explain the difference among IMR, ICR, INR, and IFR 18650 batteries?

    What is the Difference Between IMR, ICR, INR, and IFR 18650 Battery?In 18650 batteries, discerning the differences among IMR, ICR, INR, and IFR types is fundamental for tailored and efficient battery usage. These distinct
    08-02
  • Safety considerations for cart batteries

    Selecting the ideal cart battery is crucial for ensuring optimal performance and longevity of your electric vehicle or vaping device. This comprehensive guide w
    08-01