The reason why Denmark built a wind power center in the North Sea is that the wind conditions in the North Sea are superior and suitable for building wind power centers to produce electricity. The wind force in the North Sea is: the average wind speed at 50 m height is 8.5 to 9 m/s, and the wind force in Denmark is: the wind speed at 50 m is 6.5 m/s. For the best fan output state, 7.5m/s is best. Wind conditions in the North Sea are 8.5-9 m/s, which is much higher than the optimal wind speed of 7.5 m/s. This is the main reason why Denmark built a wind power center in the North Sea. The North Sea is a floating artificial island mainly used to produce and store green electricity.
Why Denmark is building a wind farm in the North Sea
Introduction The reason why Denmark built a wind power center in the North Sea is that the wind conditions in the North Sea are superior and suitable for building wind power centers to generate electricity. The wind force in the North Sea is: 50