First of all, the principle is that this wind turbine has a base to get wind. Open the personal attributes and you can see the current wind value. This generator will only run when the wind force is greater than 20%. This will not work when the wind power is less than 20%, even if there is electricity.
There is a white light next to the bottom machine, which means the wind turbine is working normally at that time. It should usually be on the Desert, Valghero or Wonderland map. The map is windy. all year round. When the wind power reaches more than 20%, only the wind turbine can operate, and it must be powered on before it can operate normally.
First place the wind turbine in a very windy place. It is recommended that the location be at the top of the building. Next, pull the cable from the back of the generator. After placing the cable, place it. at the end. AThe outlet is used to power surrounding facilities that require electricity. It has a certain power range. After connecting the cable to the socket, it is then connected to the electrical equipment.
How to reserve the position of wind power box transformer
None of the national lightning protection testing stations have standardized the specific number of points testing
< p>This is called industry regulation. Fees at each point vary by region, and the unit prices approved by price bureaus in different locations are different.But that said, what you did there is a little too much. If a wind farm has hundreds of turbines on each tower, shouldn't it charge hundreds of thousands of yuan in testing fees? It makes me dizzy. What is the surface area of the fan ground network? Generally, a simple electrical test is used.onic or megohmmeter. This test is too dark, if it gives a price, we can also negotiate. If it works, it really doesn't work. You can ask the AC electrical grounding test guide to use the high current test method. I think he will accept it. You can tell them that this is electrical equipment and must be tested accordingly. with power specifications. The high current method is not used, the electrical system does not recognize the test results and cannot connect to the grid to generate electricity. Everyone does business if they are willing to use the high current method. unit with more than 3,000 units, I will be cruel to him!
But that said, if it's really ruthless and you ask, a wind turbine requires three current injection points, and the test uses two directions, I think it will do it.
Haha, it's a joke to say that. The workhe lightning protection detection stations is generally easy to do. Generally, the work of wind farms is also appreciated by the local government. to do the job of director. Exemption is possible. I believe a unit can be tested using an electronic meter or a flip-flop meter. A wind farm can charge tens of millions. for testers to express their gratitude and everyone will be able to do their work easily.
The following aspects should be considered when reserving the position of the wind power box transformer:
1. The size and weight of the wind power box transformer: the size of the reserved. the space should be determined according to the actual situation and bearing capacity.
2. Installation method of wind power generation box transformer: According to the installation method of wind power generation box transformerion of wind energy, determine its reserved position and support structure.
3. Cable Direction and Connection Method: Cable direction and connection method should be considered in order to reserve suitable trunking or pipes.
4. Environmental factors: It is necessary to consider the environmental factors where the wind power generation box is located, such as temperature, humidity, protection level, etc., to determine the reserved location and the protections. measures. Wind power generation box transformer refers to the transformer box used in wind power generation systems. It is mainly used to convert electrical energy generated by wind turbines into electrical energy suitable for transportation.