From a regional point of view, a photovoltaic plant of around 2 MW (2 million watts = 2,000 kW) can be built.
The investment requires around 16 to 18 million d euros, with solar panels accounting for about half. of the system cost and the other half mainly in inverters, mounting brackets, confluence, distribution and other electrical equipment, as well as construction.
Large-scale PV plants can generally recoup their investment in about 6 years, based on subsidies or the National Development and Reform Commission process.