Of course how you work depends on which department you are in, and your salary is related to the department. Inspection and maintenance requires climbing the tower. Some units have integrated operation and inspection, so they all have to climb. It mainly depends on the unit and department. Is the one upstairs so exaggerated, six figures? I have never seen wind power wages so high. Why are there such rumors? It's really exaggerated. You think you will be at the manager level when you enter. It's not like you were poached for technical skills. They are just apprentices and general workers. The salary is considered average in the Jiajiu area. It takes 3 and a half hours from China Power Investment Corporation to Jiuquan City. I'm right here.
SDIC Baiyin Wind Power Co., Ltd. is a wholly-owned subsidiary of SDIC Huajing Electric Power Holdings Co., Ltd. and is also the first wind power project company of SDIC Group. The company was established on July 20, 2007, with a registered capital of 90 million yuan. Mainly responsible for the engineering construction, production operation and maintenance of the 45MW wind power concession pilot project of Baiyin Pingchuan Jiancaitang Wind Farm in Gansu Province, as well as the development and construction of subsequent wind power projects in Gansu.
The wind farms currently in operation include:
1. Jiancaitang Wind Farm
The 45MW wind power concession pilot project of Gansu Baiyin Pingchuan Jiancaitang Wind Farm is one of the second batch of wind power concession bidding pilot projects below 50,000 kW in Gansu Province organized by the Gansu Provincial Development and Reform Commission. The fourth power project invested and constructed by SDIC Huajing Company in Baiyin City after Jingyuan Second Power Generation Company, Gansu Small Three Gorges Company Daxia Hydropower Station and Wujinxia Hydropower Station. The wind farm is located in Jiancaitang Village, Wangjiashan Town, Pingchuan District, Baiyin City. It has an installed capacity of 45MW and installs 30 wind turbine units with a single unit capacity of 1500kW. It is equipped with a 110kV step-up substation and is connected to the Gansu power grid with 110kV voltage. The total investment is estimated 436 million yuan. It is planned that the first batch of units will be put into operation in October 2008, and all units will be completed and put into operation by the end of 2008. On October 18, the first wind turbine unit of the 45MW Jiancaitang Wind Farm Project of SDIC Baiyin Wind Power Co., Ltd. was successfully connected to the grid at one time.
2. Beidaqiao Dongfeng Farm
Gansu Guazhou Beidaqiao Dongfang 49.5 MW project is located in Jiuquan, Gansu Province Located on the Gobi Desert about 10km northeast of Guazhou County, it is jointly invested and constructed by SDIC Huajing Electric Power Holding Co., Ltd. and Gansu Huineng New Energy Technology Development Co., Ltd., with investment ratios of 65% and 35%. The project has an installed capacity of 49.5 MW, installs 33 wind turbines with a single capacity of 1500kW, and builds a 110kV step-up substation to transmit power to the Guazhou substation 110kV system. The estimated dynamic total investment is 499 million yuan.
On June 3, 2008, the Beidaqiao Dongfeng Farm Project was approved by the Gansu Provincial Development and Reform Commission; on July 21, the project company-SDIC Jiuquan First Wind Power Co., Ltd. was registered established.
3. NorthThe Second Bridge Wind Farm
The 200MW project site of the Second Bridge Wind Farm in Guazhou, Gansu Province is located in the Gobi Desert about 30km northeast of Guazhou County in Jiuquan Prefecture. It is designed to install 134 wind turbines with a single capacity of 1,500 kW, with a total installed capacity of 201MW, an annual grid-connected power of 447.89 million kW.h, and an annual utilization hour of 2,228h.
A Beidaqiao East 330kV step-up substation will be built in the second and third Beidaqiao wind farms to collect the generated wind power to the substation and step it up to 330kV voltage. Level, feed into 750kV Guazhou transformer, the total estimated investment in the pre-feasibility study stage is 1.9737622 million yuan.