The generator voltage of Beilun Power Station is less than 10 megawatts. The output voltage of the power plant generator is: approximately 6 kV below 10 MW, 10.5 kV for 50 to 100 MW and 18 kV for 300 MW. The power generation principle of the power plant is to use the power generation device to convert hydroelectric energy, thermal energy of petrochemical fuels (coal, oil, natural gas), nuclear energy, solar energy, wind energy, geothermal energy, ocean energy, etc. . in electrical energy to produce electricity.
Guodian Zhejiang Beilun No. 1 Power Generation Co., Ltd., formerly known as Zhejiang Beilun Power Plant, is China's first thermal power plant built with loans from the World Bank. All major equipment was purchased through international tenders. . The Nortel projectera built in two phases, with a total investment of 14.88 billion yuan. The first phase of the project, a 2 × 600 MW sub-critical coal-fired unit, began construction in January 1988 and was commissioned in November 1994. The second phase of the project, a sub-critical coal-fired unit critical of 3 × 600 MW, started construction in June 1996 and was put into operation in September 2000. In order to make full use of the existing land, facilities and other resources of the power plant, in accordance with the strategic power development plan of the “Project 1691” of China Guodian Corporation, Nortel is currently actively carrying out the third phase of 2 × 1000 MW ultra-supercritical coal expansion. -units fired.