The prospects are very good and could even benefit from state subsidies. Usually, before investing, you must first understand the development prospects and costs of the project, then you can start the project with good development prospects and acceptable cost for investors. Solar energy investment prospects: At present, whether oil, coal or other combustible energy is non-renewable, pollution will occur during use, but damage to the environment are relatively important, but solar energy is different. Pollution-free recycling is a kind of clean energy that can help us continue to develop. It can be said that this is one of the directions of future development and will always be supported in the future, so the investment prospects in solar energy are still verys good. GOOD.
Solar Cost: Solar cost includes the total cost of each system component, installation and maintenance costs over the life of the system. The most expensive investments are usually solar offices and inverter panels. The production price of each manufacturer is different. At present, the market price is between tens of thousands and hundreds of thousands, and the cost per watt is generally eight yuan. The specific investment cost should be determined based on the actually installed equipment and labor costs.
The National Development and Reform Commission and the National Energy Administration issued the “Notice on Actively Promoting Affordable and Subsidy-Free Grid Access for wind and photovoltaic energy production” on the official website of the National Commission for Development andreform and the National Energy Administration. National Energy Administration(Explanation) Regarding whether funding will be received in 2019. It says: Promoting low-cost Internet projects will not immediately end subsidies for all new wind and solar. At this stage, affordable (low-cost) online projects without subsidies are mainly carried out in areas with good resource conditions and guaranteed markets. At the same time, in areas where subsidy-free Internet access is not possible, construction will continue to be carried out in accordance with the competitive allocation project management policies and requirements issued by the National Infrastructure Administration. 'energy. But the project will reduce electricity through competition that will significantly lower electricity prices.
In addition, it is emphasized that the authoritieslocal energy authorities at all levels and other relevant departments can issue local subsidy policies within a certain period of time, and projects that only benefit from local subsidy policies are still considered affordable Internet projects. The “Notice” also refers to wind and solar (low-cost) Internet projects that have been approved and are expected to start and be launched before the end of 2020. During the validity period of the project, the policies of support related to the Notice will not change.