No. The wind power index is a new energy project. If you want to connect to the grid to generate electricity, you need to apply for the index from the State Grid before the project is approved. This index cannot be obtained. If you want to obtain the index, you can consult the local Development and Reform Commission about the national development plan and prepare project proposals. The documents and basic design shall be submitted to the National Development and Reform Commission for review, and approval will be granted if the requirements are met. Wind power indicators reflect the operational reliability of wind turbine equipment and use two indicators: wind turbine availability and wind farm availability.
Can wind power indicators be obtained from the state?
Introduction Can wind power indicators be obtained from the state? No. The wind power index belongs to new energy projects. If you want to connect to the grid to generate electricity, you need to apply for the index from the State Grid before the project is approved.