Do you want to ask how long it takes to hoist wind turbines in onshore wind power plants? 3 days.
The entire process of wind turbine hoisting includes multiple steps such as preparation, hoisting blades, hoisting main head, hoisting generator, hoisting tower and electrical installation. Among them, hoisting the blades and hoisting the main head are the longest steps, and it takes 3 days to hoist a single wind turbine. In addition, the hoisting of wind turbines is also affected by many factors such as weather, geographical location, equipment model, etc., so the exact hoisting time cannot be given.