The wind and solar vertical complementary photovoltaic power generation project in Qingxi Village, Susong County, Anhui Province, and the vertical photovoltaic power generation project in Sijing Village, Cheqian Town, Liangshan County, Shandong Province.
1. Wind and solar vertical complementary photovoltaic power generation project in Qingxi Village, Susong County, Anhui Province: This project was completed in 2018 and is located in Qingxi Village, Susong County. It was invested and constructed by Anhui Heli Photovoltaic Investment Management Co., Ltd. throughout the In the project, photovoltaic power generation is the main method. The annual power generation is expected to be 10 million kilowatt-hours, which can provide power support for 16,000 local residents.
2. Vertical photovoltaic power generation project in Sijing Village, Cheqian Town, Liangshan County, Shandong Province: This project was invested and constructed by Solar Photovoltaic (Qingdao) Technology Development Co., Ltd. and officially started construction in 2018. The project uses buildings, roads Wait for every available space to be used for photovoltaic power generation.
Where is the Baizishan Wind Power Station in Anqing?
By 2020, the Wanjiang Demonstration Zone will form a "three horizontal and five vertical" comprehensive system consisting of public roads, railways and water. transportation channel. Among them, the "three horizontals" refer to the comprehensive transportation corridor along the river, the Nanjing-Hefei-Wuhan comprehensive transportation corridor, and the Anhui-Ganxi comprehensive transportation corridor; the "five verticals" refer to the Hefei-Xuancheng-Hangzhou comprehensive transportation corridor, and the Hefei-Anqing-Jiujiang comprehensive transportation corridor. Transportation corridor, Lu'an-Anqing-Jingdezhen comprehensive transportation corridor, Hefei-Tongling-Fuzhou comprehensive transportation corridor, Xuzhou-Chuzhou-Nanjing comprehensive transportation corridor.
The above is the content of the "Infrastructure Plan for the Demonstration Zone for Industrial Transfer in the Wanjiang Urban Belt" announced by the provincial government yesterday. In addition to transportation, it also includes infrastructure in various aspects such as energy, resources, and information technology. The construction has been planned in detail. In the future, Wanjiang will build two wind power bases and the scale of wind power generation will exceed 300,000 kilowatts. Among them, Chuzhou Wind Power Base will build Laian Longtou Port, Longwo Temple, Dongsi Port, Baoshan and Dagang wind power projects, with a total installed capacity of 247,500 kilowatts. For wind power bases along the river, the main purpose is to speed up the preliminary work of Wangjiang, Susong and Tianchang projects. At the same time, the Wanjiang Demonstration Zone will also vigorously plan wind farm projects along rivers and lakes.
Pipeline gas supply to all cities and counties in the area. Our province will speed up the work of natural gas pipeline connections, expand the coverage of the natural gas pipeline network, and strive to provide all cities, counties and key organized towns in the demonstration area by 2015. , to realize pipeline gas supply. In September 2006, the project proposal was submitted to the National Development and Reform Commission, and the project feasibility study was fully launched.
On September 17, 2006, CGN commissioned the Hydrological Resources Survey Bureau of the Middle and Lower Reaches of the Yangtze River to carry out site selection for hydrological stations in Fanchang.
In November 2006, the Wuhu Nuclear Power Project Preparation Office of China Guangdong Nuclear Power Group was officially launched.
In October 2007, China’s nuclear power experts gathered in Wuhu to review and consult on the feasibility of the Wuhu nuclear power project.
In September 2008, Anhui Wuhu Nuclear Power Co., Ltd. was formally established.
On November 6, 2008, the Anhui Provincial Development and Reform Commission and the Shanghai Development and Reform Commission jointly submitted a report to the National Development and Reform Commission.The National Development and Reform Commission and the National Energy Administration submitted a request for instructions to include the Wuhu nuclear power project in the national nuclear power "Twelfth Five-Year Plan" development plan. At the same time, they clearly proposed that the Wuhu nuclear power project be the preferred target of Anhui nuclear power.
In Susong County, Anqing City, Anhui Province. The Guodian Susong Baizizhou Wind Farm Project is located in Susong County, Anqing City, Anhui Province. The project is located in the state-owned Huayang River Farm and Zhoutou Township, Fuxing Town. The site borders the Yangtze River to the south, Huang Lake to the east, and Dagon Lake to the west. , connected to the north of the existing Guodian Susongxihu Weihuagang Wind Farm Project.