Ability
With the end of the rush to install, the bidding volume of affordable projects has increased significantly. From January to October 2021, the scale of wind power public bidding reached 52GW, approaching the 2019 level. The highest level in history and abundant wind power bidding volume in 2021 means that the prosperity of the wind power industry in 2022 is expected to exceed expectations.
With the end of the rush to install, the bidding volume of affordable projects has increased significantly. From January to October 2021, the scale of wind power public bidding reached 52GW, approaching the historical high level in 2019. There will be abundant wind power bidding volume in 2021. This means that the prosperity of the wind power industry in 2022 is expected to exceed expectations.
In the main wind direction, the general distance between units is 8D to 12D (D is the diameter of the wind turbine impeller). This depends on the wind resources and land resources of the wind farm, mainly on the distribution of wind energy roses. , generally between 3~5D*8~12D. Detailed calculations and comparisons are required.