I think there are three main points.
1. One of the main obstacles affecting the development of China's wind power industry is the lack of talent and technology, which makes the localization of wind power equipment manufacturing a technical bottleneck.
2. Cost and price are also one of the factors affecting the development of wind power. The cost of wind power generation is mainly fixed asset investment cost, accounting for more than 85% of the total investment. One of the biggest bottlenecks in wind power development is the huge one-time investment, and the unit cost is higher than that of thermal power and hydropower. In addition, long-term maintenance is also a big burden.