It's built. The wind tower in Liuquan City, Henan Province, was built in 2017. It is the first new magnetic levitation vertical axis wind power project in China. Construction began in Dingwan Village, Liuquan Town, Yiyang County. manufacturing industry and create a new green and clean energy base.
How much area does the wind power transmission tower occupy?
Administrative approval procedures for lightning protection are required. Wind towers are tall buildings that are easily affected by lightning. Lightning is a common natural phenomenon that can have a devastating impact on buildings and equipment. Therefore, in order to protect wind towers from lightning damage, it is necessary to go through this. administrative approval procedures for lightning protection and carrying out designption and construction of lightning protection.
How big is the foundation of the wind tower?
100 square meters. The wind power transmission tower covers an area of 100 square meters. A 4.2 MW wind power plant occupies approximately 100 square meters, which is equivalent to 0.15 acres of land. in electrical energy. Wind energy is a clean and pollution-free renewable energy that has been used by people for a long time, mainly through windmills to pump water, grind flour, etc. People are interested in how to use wind to generate electricity.
First of all, your question is too general.
This is a high-power unit built in several types of wind farms. CEI1, 2 or 3?
What type of tower shape is used, firm type? Conical tubular? (The latter is more common, but the former is also used)
What aret the geological condition of the wind farm? The foundation is naturally different depending on the geological conditions. If you are responsible for this, you need to find a qualified design institute.
Furthermore, even for wind farms of the same power and level, large manufacturers (those with real design capabilities) will generally provide towers of different heights depending on the topography of the wind farm and other characteristics.
I'll give you an example that I encountered:
The 2 MW conical tubular steel tower used in IEC2 wind farms is 73 meters high and has three sections , with an upper diameter of 3.1 meters and a lower diameter of 4.2 meters. The wall thickness at different positions is 12-28mm and the weight is 130 tons. The foundation depends on where it is built. Generally, the total quantity of reinforced concrete used amounts to several hundredtons.