Halo, the power plant experts are not in place, how can they compare with others, and the general power plant employees are all the same. Tianchi's profits in recent years have been quite good. The employee benefits are very good. Annual leave is tied to the number of years with the company, not to mention benefits. Even single people have quotas to deal with it, but I don't have any. I don't know the specific charges.
Too many
17.2 Hecheng Coal Mine 3,000 kW Gas Power Generation Project
17.3 Changyuan Yanjin Fengqiu Three Counties Natural Gas Project
17.4 Xinyang Xinxian 220kV Substation Project
17.5 2×330 Phase 1 Unit Project Huadian "larger and smaller" MW
17.6 Xinxiang City Waste Incineration Power Plant Project
17.7 The Third Generation Expansion Projectth phase of 2×1000 MW unit of Guodian Xingyang Coal and Electricity Integration Co., Ltd.
17.8 The second phase expansion project of Guodian Xingyang Coal and Electricity Integration Co., Ltd., unit 2 × 1000 MW
17.9 Wanji “large and small” cogeneration project 2 × 300 MW
17.10 Gangue power generation project Huaneng Jiaxian Coal Plant 2 × 300 MW
17.11 Guodian Zhumadian Heating Unit Expansion Project 2 × 300 MW
17.12 Huaneng Jiaxian Coal Plant Expansion Project Luyang of China Power Investment Corporation (phase II)
17.13 Huaneng Qinbei Power Station Expansion Project, Phase IV (2 × 1,000 MW)
17.14 Project Xinmi Power Station Expansion, Phase II, 2 × 1,000 MW
17.15 Pingdingshan Second Power Station Expansion Project, Phase II, 2 × 1,000 MW
17.16 Yuzhong Power Plant Expansion Project with 21000 MW units
17.17 2 × 300 MW thermal power generation unit project in Datang Linzhou
17.18 Datang Yanshan power plant unit project with 2 × 1 million kilowatts
17.19 Jiaozuo Longyuan Power Station Project 2 × 600 MW
17.20 Sanmenxia Thermal Power Station Phase III Project
17.21 Shenhuo Group 1 × 600MW Project “upgrading to large size and removing small” unit project
17.22 Jiaozuo Power Plant 2 × 1 million Environmentally Friendly Relocation Project kilowatt unit environment
17.23 Huaneng Yimakengkou Power Station Phase I Project
17.24 Five 500 kV transmission transformers, including Henan Tapu~Xiangfu~Xuchang ~Shaoling II Circuit Electrical Engineering
17.25 Shangqiu City Shangda Pressure Small (1×600MW) New Project
17.26 Huadian Qudong Thermal Power (Phase I) Desulfurization Project
< p>17.27 Jiaozuo West to Tapu 500 kV Double Circuit Power Transmission and Transformation Line Project