The 20 MW photovoltaic plant is a large-scale project.
The project covers an area of approximately 50 hectares and costs 200 million. It's a big project.
Photovoltaic power plant refers to a photovoltaic power generation system connected to the power grid and transmitting energy to the power grid. This is a state-sponsored green energy project. It can be divided into grid-connected power generation systems with and without batteries. Solar power generation is divided into photothermal power generation and photovoltaic power generation. Solar power generation generally refers to the production of solar photovoltaic power.
20 MW
Photovoltaic power plant construction plan
The total construction period is only three months. Initial preparations (site preparation, materials preparation, temporary construction installationsraries) This will take time, and subsequent steps will require more time. A few days are set aside for curing the concrete, but the actual curing time is only more than two months. In order to ensure the construction period, the number of people will be increased or decreased flexibly according to the specific workload and project progress.
Technical construction arranges flow operations according to the number of square arrays, starting from the top square array ① in horizontal rows down, to the last square array ⑥, substation. The building can be built together. with the foundation, and the complete building and distribution room can be constructed separately during the foundation construction period. Special construction technology: It is recommended to use cast-in-place cylindrical piles as the foundation of the component support, and 8 Q235 steel plates of size 150X150 thick to be integrated as the welding surface of the support and the foundation. This may eliminate the problem. occurrence of support and foundation construction within a wide error range.
In terms of construction machinery and tools: consider installing 2-4 small mobile mixers on site, and working in shifts can ensure material supply needs. Provide 2 small motorized dump trucks and 3 trolleys for each mixer to transport the concrete. If the project requires it, a concrete delivery pump may be considered to meet concrete delivery requirements in complex terrain.