Aerospace Longyuan (Benxi) Wind Power Co., Ltd. was founded on June 13, 2006. It is a Sino-foreign joint venture. The company is located in Yanhe Street, Huanren Manchu Autonomous County. The wind farm is located on Niumaoda Mountain in Wafang Village, Pulebao Town. It covers an area of 18,242 square meters, of which the construction area is 820 square meters. The company has total assets of 207.9 million yuan, including fixed assets of 193.7 million yuan, current assets of 14.2 million yuan, and an asset-liability ratio of 54.87%. The company currently has 21 employees, including 6 middle-level and above managers, accounting for 28.6% of the employees. The company's main product is wind power generation, which was acquired by Liaoning Power Grid after being merged into it. The annual designed power generation capacity is 53.93 million kilowatt-hours.
The actual power generation capacity in 2007 was 31.14 million kilowatt-hours. The total industrial output value was 9.76 million yuan, the sales revenue was 15.62 million yuan, the profit was 10,000 yuan, and the tax paid was 1.22 billion yuan. Ten thousand yuan.
The company's goals for 2008 are to generate 54.64 million kilowatt-hours of electricity, with a profit of 7.02 million yuan, and to actively prepare for the second phase of the wind power project.
If you are applying for operation, then there is no danger. If it is maintenance, lines and fans are a bit dangerous, but if you follow the relevant regulations and regulations, there is no big danger. Moreover, state-owned enterprises have strict safety requirements and will not let you take risks.