222. Wind power plant (WindFarm), referred to as wind power plant, is a power plant that uses wind to generate electricity. It is a type of renewable energy power plant. There are 222 wind power plants in Yunnan Province, Yunnan Province, referred to as Yun or Dian, China 23 One of the provinces, located in the southwest region, with the provincial capital Kunming.
Who is the investor in the self-built wind power project in Zhetu Township, Wenshan Guangnan?
Guodian Yunnan Longyuan Luoping Wind Power Co., Ltd. was registered and established on 2017-12-21 Limited liability company (state-owned holding) with its registered address at No. 14, Wanfeng Road, Luoxiong Street, Luoping County, Qujing City, Yunnan Province.
The unified social credit code/registration number of Guodian Yunnan Longyuan Luoping Wind Power Co., Ltd. is 91530324MA6MX1JP6G. The corporate legal person is Zhang Binquan. The company is currently in business.
The business scope of Guodian Yunnan Longyuan Luoping Wind Power Co., Ltd. is: development, construction management and operation of new energy projects and related industries; installation, commissioning and maintenance of wind power generator sets; new energy and wind power technology consultation and training. (Projects that require approval according to law can only carry out business activities after approval from relevant departments).
View more information and information about Guodian Yunnan Longyuan Luoping Wind Power Co., Ltd. through Aiqicha.
The investor in the self-built wind power project in Zhetu Township, Wenshan Guangnan is Huaneng Clean Energy (Wenshan Guangnan) Co., Ltd. According to relevant public information inquiries, the total project investment is 1.27 billion yuan. Wenshan Guangnan County will add a new wind farm. On September 10, the Yunnan Provincial Development and Reform Commission issued a project approval and approved the construction of the first phase of the Tianmashan Wind Farm project. The project is located in Guangnan County, Wenshan Prefecture. The project has been included in the "Yunnan Province Moderate Development and Utilization of New Energy Plan in Suitable Areas". In order to effectively utilize local wind energy resources and improve regional power supply capacity, the Provincial Development and Reform Commission agreed to build the first phase of the Tianmashan Wind Farm project based on relevant documents. It is understood that the project unit is Huaneng Clean Energy (Wenshan Guangnan) Co., Ltd., and the construction site is located in Guangnan County, Wenshan Prefecture, Yunnan Province. The project has a total installed capacity of 200 MW and mainly constructs 50 4 MW wind turbine units. The total investment of the project is 1.27 billion yuan, and the construction period is 12 months.