March 2023. According to the official website of the Urumqi government, Urumqi Dabancheng 1.1 million kilowatt wind power market-oriented grid-connected project started physical construction in March 2023. The project includes Qiji II Line T connection with Haofeng Clean Energy Dabancheng’s distributed wind power boost collection Station 110 kV line project, Qijiagou substation, Jijicaozi substation 110 kV protection and renovation project, etc., with 2.01 kilometers of new lines, with a total investment of 4.58 million yuan. Urumqi, commonly known as Urumqi and formerly known as Dihua, is a prefecture-level city, the capital, and a large city in the Xinjiang Uygur Autonomous Region.
When is the best time to visit Dabancheng District?
The second largest wind power plant in Asia, Huitengxile Wind Power Plant was built in 1996 and is located in Chayou, Ulanqab City, Inner Mongolia Located in the Huitengxile Grassland in Zhongqi, at the beginning of its establishment, the power plant imported nine 6-million-kilowatt wind turbine units from Denmark and achieved grid-connected power generation in November of the same year. There are currently 94 installed units with a total installed capacity of 68,500KW. In 2004, 10 GE1500KW wind turbine units, the largest single unit capacity in China, were installed for the first time.
The largest wind energy base in Asia - Dabancheng Wind Power Plant in Xinjiang.
Best time in Dabancheng District: June to September
Wind power plants are located on both sides of the Chaiwopu-Tuwu Expressway. It is operated by Xinjiang Tianfeng Power Generation Co., Ltd. There are currently 172 units with a total capacity of 90,500 kilowatts. The single unit capacity is 300, 500, 600, and 750KW, the tower height is 30, 35, 40, and 50 meters, the annual effective wind speed is greater than 7,500 hours, and the maximum annual power generation is 165 million kilowatt hours. It is the largest wind power enterprise in China, and its majestic The landscape echoes Chaiwopu Lake.