Luoyang Changen New Energy Technology Co., Ltd. is a limited liability company (natural person investment or holding) registered in Yichuan County, Luoyang City, Henan Province on April 12, 2018. The registered address is between Binhe Avenue and Yichuan County, Luoyang City. 100 meters west of the intersection of Gaoxin 9th Road.
The unified social credit code/registration number of Luoyang Changen New Energy Technology Co., Ltd. is 91410329MA453LHD77, the corporate legal person Dong Jizhang, and the company is currently in business.
The business scope of Luoyang Changen New Energy Technology Co., Ltd. is: development and promotion of photovoltaic technology and wind power technology, purchase and sale of complete sets of wind power equipment and parts, and development and management of wind farms. (Involving licensed business projects, you must obtain permission from relevant departments before operating). Within this province, the current registered capital of enterprises is average.
View more information and information about Luoyang Changen New Energy Technology Co., Ltd. through Baidu Enterprise Credit.
When will the wind power project start in Yichuan County, Henan Province?
1. The Henan Yichuan wind power project can share part of the pressure from traditional power generation methods such as coal-fired power generation, which will inevitably alleviate the pressure on power consumption during peak hours, thereby reducing the possibility of power outages in residential areas.
2. The main energy source of wind power generation is wind. It is inexhaustible and will not cause public hazards or pollution to the natural world. It is a new energy source that is very suitable for use according to local conditions. . The construction of wind power projects in Yichuan, Henan has increased the diversification of national energy production with good environmental benefits.
Wind foundation dimensions in Yichuan County, Luoyang City
January 2018. According to the official website of the Henan Provincial People's Government, the Yichuan County wind power project in the area started in January 2018. The project is a power development project, including: *scale 30MW, 10 units planned to be installed, single unit capacity 3.0, MW-level wind turbines, And build a booster station.
Each basic specification is 14 meters * 14 meters.
According to the query on Jiancheng.com, wind power generation converts the kinetic energy of the wind into electrical energy. The working principle is to use large rotor blades to convert the kinetic energy in the wind flow into rotational kinetic energy. By increasing The speed machine increases the rotation speed, and the rotation speed of the rotor blades reaches 30 to 150 revolutions per minute, and the rotating mechanical energy is converted into electrical energy through the generator.