Wind turbine pile foundations are dug using earthmoving construction machinery and equipment. According to the query of relevant public information, earthmoving construction machinery and equipment are used to excavate to ensure the efficiency and quality of excavation. The depth and diameter of the excavation are required to ensure the stability and bearing capacity of the pile foundation. When excavating wind turbine pile foundations, according to specific For design and construction according to the geological conditions and engineering requirements, the excavator needs to have sufficient power and stability.
The reasons for the corrosion of pipelines caused by wind power are as follows:
1. Wind farms require deep excavation and construction of the wind turbine tower foundation, which will destroy or change the original soil structure. Causes problems such as changes in groundwater levels and soil erosion, thereby accelerating the corrosion of pipelines.
2. Natural water sources such as rain and snow will accumulate around wind farms. These water sources will come into contact with pipelines through groundwater, increasing the risk of pipeline corrosion.