The treatment is good.
Huaneng Anhui Wind Branch is located in Hefei City, Anhui Province. It is mainly responsible for the development, construction and operation of Huaneng wind resources in Anhui province. In terms of remuneration, the basic salary in the wind power industry is generally between 4,000 and 5,000 yuan, and the monthly subsidies are around 2,000 yuan. The specific amounts of performance awards and year-end bonuses vary from company to company and region to region. Region taken together, the annual income is about 140,000 yuan.
Which one should I choose based on a comprehensive comparative analysis between Huaneng Wind Power Plant and county-level power companies?
The investor in the self-built wind power project in Zhetu Township, Wenshan Guangnan, is Huaneng Clean Energy (Wenshan Guangnan) Co., Ltd. According to relevant public information surveys, the total investment of the project is 1.27 billion yuan. Wenshan Guangnan County will add a new wind farm On September 10, the Yunnan Provincial Development and Reform Commission approved the project and approved the construction of the first phase of the Tianmashan wind farm project. The project is located in Guangnan County, Wenshan Prefecture. The project was included in the "Yunnan Province Plan for Moderate Development and Utilization of New Energy in Suitable Areas". In order to effectively utilize local wind resources and improve regional power supply capacity, the Provincial Development and Reform Commission agreed to construct the first phase of the Tianmashan wind farm project based on relevant documents. It is understood that the project unit is Huaneng Clean Energy (Wenshan Guangnan) Co., Ltd. and the construction site is located in Guangnan County, Wenshan Prefecture, Yunnan Province. The project has a total installed capacity of 200 MW and is mainly constructing 50 4 MW wind turbine units. The total project investment is 1.27 billion yuan and the construction period is 12 months.
The living environment of wind power companies is difficult, and county-level power companies are very boring. It would be preferable if they were located in the capitals. Wind power plants are usually located in mountains. wind power companies and county-level power companies may be slightly higher, but not much different. The outlook for wind and electric energy companies is similar. Wind power is a bit risky. If you like a good environment and good air, and if you can't stand loneliness, you can oopt for wind energy production. It's a little harder for your wife. If you don't want to endure hardship, don't come. I work in a wind farm and I think Huaneng Wind Power has a better future than the county power companies. It depends on what type of county you are in~