Construction of the project began in November 2008.
Wulong Xingshun Wind Farm is located on Siyanping High Mountain in Xingshun Village, Heshun City , Wulong County, at an altitude of 1,500 to 1,700 meters. It is developed and built by Datang International. and covers an area of about 6.6 square kilometers, the power station has a total installed capacity of 46,750 kilowatts, a single unit capacity of 850 kilowatts, a total of 55 installed machines, a total investment of 580 million yuan and can. providing 89.38 million kilowatt hours of electricity to Chongqing every year. The electrical energy produced by the wind farm is sent to the Wulong Baima Liming 110KV substation of the Chongqing power grid via a 110KV single-circuit transmission line. The annual usage hours are 1,871 hours and the annual grid-connected power is 87.47 million kilowathours. .
Construction of the project began in November 2008. On May 28, 2009, the first unit was connected to the grid for electricity production. In October 2010, all units were commissioned.