It is windy all year round and it is close to the sea.
The northern area of Weifang is located in the northern temperate monsoon zone, with the back of the land and the sea facing the sea. The climate is warm and semi temperate monsoon type. - humid continental type. Its characteristics are: cold winters and hot summers, four distinct seasons, more wind and less rain in spring. Summer is hot and rainy, with high temperatures and humidity, and autumn is sunny and cool. There is much drought in late fall and the winter is dry and cold with frequent cold winds. The average annual temperature is 12.3℃, and the average annual precipitation is about 650mm.
Requirements for building a wind power plant: The area must be large and there are no obstacles in all directions, and there must be a certain wind flow. Wind farms are more suitablecoastal areas and vast grasslands. If you are in the city, a small one is also possible, but the prerequisite is that there is enough wind.
What are the natural conditions for wind energy production? Compared to hydropower generation, what are the differences in cost, profit and loss?
First, it is important that the number of hours of wind energy available per year is greater than 4,380 hours, otherwise you will lose everything;
Second, there must be a detailed wind analysis. resource investigation report: the Provincial Development and Reform Commission has;
Third, it is necessary to obtain decision-making support from the local government and the project resources are limited;
Fourth, more money is needed, 30% free funds, and an investment of more than 300,000 kilowatts.
This question covers a wide range ofe domains; There are many conditions to consider in wind power construction. Wind density and speed are the basic conditions. Second, land acquisition, roads, etc. Compared to wind power, hydropower is characterized by high construction costs but relatively low maintenance costs. But today there are essentially two forms of energy use. From the point of view of power plants, wind energy is of course preferred because the investment is low. From a power grid perspective, we hope to have more hydropower and strong peak shaving capabilities. Rarely consider economics alone.