The current installed capacity of Pingyuan photovoltaic power generation is 40 MW. Concord Solar Power Co., Ltd. was built with an investment of 500 million yuan from China Wind Power Group. It used the hydraulic construction land on the east side of the Xiangjiahe Reservoir in the plains to install more than 130,000 polycrystalline silicon photovoltaic panels. an installed capacity of 40 megawatts, the largest distribution-type photovoltaic energy production project in the province. Once the project is completed, it will be able to produce 60 million kilowatt hours of electricity per year. This would save around 16,640 tonnes of standard coal per year and reduce emissions by around 48,000 tonnes of carbon dioxide, 592 tonnes of sulfur dioxide, 17.6 tonnes of soot and 4,800 tonnes of ash. The annual turnover can be around 60 million yuan and the annual taxaverage paid is 15 million yuan.
How much does a small wind power plant cost?
Does this mean the installation costs of offshore wind generators?
Lifting and dismantling costs The installation of wind turbines varies depending on different geological conditions. Terrain and climate vary widely;
In lowland areas, including the Gobi, lifting installation costs are basically between 120,000 and 200,000, depending on local climatic conditions; p>
In mountainous areas, where wind farms are located in the mountains, etc., the cost of installing cranes roughly varies between 250,000 and 400,000;
On board sea, intertidal areas, etc., the installation costs of cranes basically range from 250,000 to 350,000;
Currently, wind power plants are built in mountainous areas or in the plains , and the cost per kilowatt is 7000 to 8,000 yuan. the cost is much higher, with the cost per kilowatt being 10,000 yuan or even more. Today, small wind power plants have an installed capacity of 50,000 kilowatts and the investment is 350 to 400 million yuan. The above refers to investments by state-owned companies, but there are also individuals investing in wind power construction. The most important consideration for individuals in wind power construction is to indefinitely reduce investment when acquiring land, local authorities and ordinary people. will also understand that they cannot be treated on an equal footing with state-owned enterprises, which can save a lot. Design The government will pay more attention to optimized design and not focus on face-saving projects like state-owned enterprises. which are notthe best known can be selected during the tender process. Based on the above factors, the cost of kilowatts invested by individuals will be 10-20% lower than that invested by state-owned enterprises. The cost of a small wind power plant with an installed capacity of 50,000 kilowatts is 270-300 million. yuan.
Not necessarily accurate, for reference only.