1 Step 1 The entire process of the automobile engine assembly line is as follows: the bottom of the cylinder is facing down, the cylinder, crankshaft, camshaft are fed, cleaned, blown, and the diesel engine model and number are printed. After the cylinder is turned 180°, place a number to confirm. After the cylinder is turned over, the bottom of the cylinder faces upward. Loose the tile cover, remove the tile cover, install the upper and lower shaft tiles, install the piston cooling nozzle, insert the camshaft key, install the camshaft thrust plate, hang the crankshaft, and drive the key. Drive the front pin into the rear pin, apply oil to the cylinder hole, install the piston, install the connecting rod cover, tighten the connecting rod bolts, and inspect the internal components. Install the front end plate of the diesel engine, install the engine filter assembly, apply glue to the oil pan, install the oil pan and tighten it. Interior parts confirmation is recorded in the engine record sheet. After the connecting rod is numbered, disassembled and cleaned, the connecting rod is installed with the connecting rod shoe, piston weight grouping, piston heating, piston pin installation, and piston ring installation. The cylinder body is turned 180° with the top of the cylinder facing up. 2 Step 2 Install the rear end plate, install the machine cooler, install the water pump assembly, install the vacuum pump assembly, install the vacuum pump lubricating oil pipe, and install the fuel injection pump assembly. Install the fuel injection pump assembly, lift the cylinder head, and tighten the cylinder head bolts. Install the rocker arm assembly, adjust the valve clearance, and fill the rocker arm shaft with oil. Check the valve clearance, install the breather, install the rocker cover assembly, install the fuel injector assembly, and install the small oil return pipe assembly. Install the generator assembly, install the V-belt, install the exhaust pipe, install the exhaust pipe heat shield, and install the heater water pipe joint. Install the high-pressure oil pipe, tighten the thermostat bolts, apply glue to the front cover of the fuel injection pump, tighten it, and install the intake pipe. Install the T/C exhaust wire to the EGR valve and inspect the appearance. Oil leak test, oil filling, visual inspection, engine assembly line and online stand-alone special equipment: cleaning machine, bearing outer ring vibration press machine, oil seal press machine, gap measuring machine, guide tightening device
Engine assembly process?
Introduction Engine assembly process? 1 Step 1 The entire process of the automobile engine assembly line is as follows: the bottom of the cylinder is facing down, the cylinder, crankshaft, and camshaft are fed, cleaned, blown, and diesel