10 days.
Working at a wind farm requires 20 days of work (20 days of food and accommodation in the factory, except for daily duty work, and you can be on call for anything), 10 days of rest, and travel The time counts as rest time. While working at the factory, they work an average of 8.5 hours a day.
Wind power engineering technology employment direction
I am an after-sales staff for a wind turbine manufacturer, and the wind power installation workers I see are all quite tired! And it's dangerous.
Basically it is purely physical work. For example: climbing the tower naked (70-80m), pulling large wires, using ropes to pull up the hydraulic pump and hydraulic wrench, climbing the tower naked while carrying the hydraulic pump (tens of kilograms), moving bolts, twisting, threading, and using hands Car turning and sanitation. . . . . .
The basic requirement for this job is: be physically strong! Haha
If the salary is less, you should stop working.
The employment direction of this major is the electric power industry.
Wind power engineering technology major is mainly engaged in the installation and commissioning, operation and maintenance, inspection and repair of wind power equipment in wind power enterprises. The employment direction should be oriented towards the electric power industry, in the field of wind power generation technology, engaged in wind farm planning and design, wind power equipment installation and commissioning, wind farm operation and maintenance management, etc.