Does it mean the installation fee of offshore wind power generators?
The lifting and installation fees of wind turbines will vary greatly according to different geological conditions, different terrains, and different climates;
In plain areas, including the Gobi, the hoisting installation fee is basically between 120,000 and 200,000, depending on local climate conditions;
In mountainous areas, where wind farms are on mountains, etc., the hoisting installation fee is basically 25,000. It ranges from 250,000 to 400,000;
On the seaside, in intertidal zones, etc., the lifting installation fee basically ranges from 250,000 to 350,000;
"City: Skylines" plain map starts Experience sharing strategy
Good.
1. Superior geographical location: Tieling Diaglai Wind Power Project is located in Tieling City, Liaoning Province. It is located in the northwest plain of Liaoning Province. It has rich wind resources and is close to the power load center, so it has high power generation potential.
2. Advanced technology: Tieling Diaglai Wind Power Project adopts internationally leading wind power technology and management model, with power generation efficiency and reliability.
How much does a small wind power station cost
Players who have bought "Cities: Skylines" have played games such as SimCity to some extent. It is easy to get started after understanding the various systems of this game. Here is my experience of starting the game on the plain map. I hope it will be helpful to everyone.
When this game first came in, I felt a little dizzy when I saw the large open space. After repeated bankruptcies, it can basically operate normally now.
The most critical and basic thing is the initial water and electricity. Once it's done, it won't go bankrupt initially.
Target map: The first plain map, suitable for us novices.
1. Water. Build a pumping and sewerage facility at the mouth of the river. Then connect the two of them with water pipes.
At this time, just run water pipes all over the map. Wherever it says there is no water or where sewage needs to be drained, just pull it there.
Pull the water pipe along the edge. It can be along the road or in the middle of a district. Try to optimize it and reduce the number of water pipes.
The advantage of water pipes over water towers is that they are extremely low cost and do not take up much space.
2. Electricity. Don't put any power plants in the open space in the middle. Just put a row of wind power plants outside. Putting land in the middle will also affect the mood of the people.
3. Garbage treatment plants have a great impact on people’s mood, so stay away from them.
4. There are three bar graphs in the middle below (people, commerce, industry). Whichever graph has a higher proportion indicates which one needs to be developed.
I only have more than 2,000 people now, and other medical and education areas are constantly having problems. Building a large carousel is also full of problems (novices, please don’t involve the large carousel yet)
Mainly, I hope it can be helpful to newbies. I think there are many people like me who are either dizzy or bankrupt.
Another problem is that the garbage disposal plant was built incorrectly. When deleting it, it always prompts that the building is not empty.
At this time, you need to build a garbage plant elsewhere, and then click the second icon below the old garbage plant to empty the garbage into other garbage plants.
Don’t close the old garbage plant at this time, it will quickly empty the garbage and then delete it.
For more related information, please pay attention to: Cities: Skyline Topic
Currently, wind power plants are built in mountainous areas or plain areas. The cost is 7,000 to 8,000 yuan. If you invest in offshore wind power, the cost is much higher. The cost per kilowatt is 10,000 yuan or even higher. Nowadays, small wind power plants have an installed capacity of 50,000 kilowatts, and the investment is 350 to 400 million yuan. The above refers to investment by state-owned enterprises, but there are also individuals who invest in the construction of wind power. The more important consideration for individuals in building wind power is to reduce investment indefinitely. When land acquisition, local officials and ordinary people will also understand that they cannot be treated equally with state-owned enterprises, which can save a lot. Design The government will pay more attention to optimized design and will not focus on face-saving projects like state-owned enterprises. In addition, manufacturers that are not the most well-known may be selected in the bidding process. Based on the above factors, the cost of kilowatts invested by individuals will be 10% to 20% lower than that invested by state-owned enterprises. The cost of a small wind power plant with an installed capacity of 50,000 kilowatts is 270 to 300 million yuan.
Not necessarily accurate, for reference only.