I think there are three main points.
1. One of the main obstacles to the development of China's wind power industry is the lack of talent and technology, which makes the localization of wind power equipment manufacturing a technical bottleneck.
2. Cost and price are also one of the factors affecting the development of wind power. The cost of wind power generation mainly consists of fixed asset investment cost, accounting for more than 85% of the total investment. One of the biggest bottlenecks in the development of wind power is the huge one-time investment, and the unit cost is higher than that of wind power. thermal energy and hydroelectricity. Additionally, long-term maintenance also poses a heavy burden.