1. For a long time, there have been two main power generation components in Guangxi: thermal power and hydropower. However, in recent years, Guangxi has vigorously developed clean energy and gradually transformed the power generation energy composition into mainly clean energy such as wind power and photovoltaic power generation.
2. Thermal power: Guangxi thermal power plants are mainly located in Liuzhou Datang Power Plant and Nanning Datang Power Plant. Hydropower: Hydropower plants mainly rely on Hechi Longtan Hydropower Plant. Nuclear power: Nuclear power plants mainly rely on Fangchenggang Nuclear Power Plant.
What is the dominant wind direction in Hechi City
200 megawatts. According to the query of the power network, the Hechi Nandan Pass 200MW wind power project is located in the ridge or hillside area of Mangchang Town, Liuzhai Town on the north side of Nandan County, Hechi City, Guangxi Zhuang Autonomous Region, and Chengguan Town on the west side. The total planned installed capacity of the project is 200 MW, install 40 large wind turbines with a single unit capacity of 5,000 kW.
The dominant wind direction is in the closed area with irregular shape and axis, and the direction is in the lower left corner of the green part where the figure is, where the largest southeast wind in the area often blows. One year, then southeasterly winds in the red part. This number is an annual wind frequency map. There is no point this season. The maximum wind power frequency generally refers to the season when the dominant wind direction throughout the year is the southeastern sea, such as the breeze blowing, and the northwest land breeze blowing in winter