1. The important thing is that the annual wind power utilization hours must be more than 4380 hours, otherwise you will lose everything;
2. There must be a detailed wind resource survey report: the Provincial Development and Reform Commission has;
Third, it is necessary to obtain the decision-making support of the local government, and the project resources are limited;
Four, it is necessary to have a lot of money, 30% of free funds, and a kilowatt investment of more than 300,000;
It has windy weather all year round and is close to the sea.
The northern area of Weifang is located in the north temperate monsoon zone, with the back of the land and the sea, and the climate is a warm temperate monsoon type and semi-humid continental type. Its characteristics are: cold winters and hot summers, four distinct seasons, more wind and less rain in spring. The summer is hot and rainy, with high temperature and humidity, and the autumn is sunny and cool. There is a lot of drought in late autumn, and winter is dry and cold with frequent cold winds. The annual average temperature is 12.3℃, and the annual average precipitation is about 650 mm.
Conditions required for building a wind power plant: the area must be vast, without obstructions in all directions, and there must be a certain amount of wind flow. Wind farms are most suitable for coastal areas and vast grasslands. If you are in a city, a small one is also possible, but the prerequisite is that there must be enough wind.