Are you asking about wind turbine manufacturing or wind power generation? What the above two said is not very comprehensive. According to wind turbine manufacturers, Sinovel, Goldwind, and Dongqi are in the first echelon, and Mingyang Wind Power, United Power, and Shanghai Electric are in the second echelon.
There are five major power groups investing in wind power: Guodian Longyuan, Huadian, Huaneng, Datang, China Power Investment, Guohua, China General Nuclear Power, China Wind Power, etc. It is difficult to say that the top three are relatively strong. These companies
The following is the work experience of a project department employee in Shanghai Electric Power Station Engineering Company, which can give you a glimpse
5 years of work experience, with overseas work and study experience
< p>Personal evaluation: I have strong organizational and coordination skills and can independently lead the team to complete some large projects. I have accumulated rich experience in both technology and management. I have strong learning ability and am familiar with the installation, commissioning and operation of gas turbine power plants; I am familiar with wind power plants and nuclear power plants. I am actively motivated, work conscientiously and responsibly, and am full of enthusiasm.Work experience 1: From July 2005 to present, he has served as the chief engineer of the project department of Shanghai Electric Power Plant Engineering Company
Main responsibilities: From July 2005 to present, he has worked in the gas turbine project department and technology Department work
From September 2005 to August 2006, I participated in the Huaneng Shanghai Shidongkou 3X400MW gas turbine power plant construction project with a total investment of 3.32 billion. During the construction of Huaneng Shanghai Shidongkou Gas Turbine Power Plant, I served as a maintenance engineer and was responsible for the installation guidance of the BOP part, as well as the technical guidance for the installation of the gas turbine and its auxiliary equipment. During the performance test, as an equipment supplier, I participated in the performance test of three units. Huaneng Shidongkou Gas Turbine Power Plant broke two records: the total project time was the shortest in the world, and the time interval for a single unit to pass the reliability test was the shortest. Now, Unit 2 of Shidongkou Gas Turbine Power Plant has been rated as the best gas turbine power plant by "Asia Power".
From August 2006 to June 2007, as the project manager of Shanghai Electric’s Zhengzhou gas turbine project, I implemented the Zhengzhou 2X390MW gas turbine power plant construction project with a total investment of 2.5 billion. During the construction of the Zhengzhou Gas Turbine Power Plant in Henan, as the Shanghai Electric Zhengzhou Gas Turbine Project Manager, I was mainly responsible for establishing and leading a team of 15 people to implement the installation guidance, commissioning guidance, operation guidance and reliability operation of the 2X 390MW gas turbine power plant. Related work. Both units are now in commercial operation.
From June 2007 to November 2007, I participated in the Zhejiang Xiaoshan 2X390MW gas turbine power plant construction project with a total investment of 2.5 billion. During the construction of Xiaoshan gas turbine power plant in Zhejiang, I served as a commissioning engineer, mainly responsible for Siemens V94...