Automatic synchronization of the generator to the grid:
1. Turn the synchronization adjustment switch to the fine adjustment position, the synchronization switch to the input position, the synchronization locking device is in the "locked" position, and observe the start of the combined synchronization table Turn;
2. Automatic synchronization:
Switch the automatic quasi-synchronization switch to the test position; press the automatic quasi-synchronization device start button, the red light above the button will light up; turn the automatic quasi-synchronization switch to the test position; Turn the quasi-synchronous transfer switch to the input position; observe that the synchronization meter stops at the 12 o'clock position, observe that the active power meter has an indication, and the grid connection is successful;
2. Turn the synchronization switch to the exit position to exit the synchronization meter , turn the automatic quasi-synchronization switch to the exit position, and the red light goes out;
3. Turn the synchronization locking device to the release position, and the synchronization adjustment to the off position;
4. Turn the generator outlet main switch to the closed position (vertical position), and the red light above the switch will light up;
Manual synchronization of the generator to the grid:
The operation process is the same as the automatic synchronization. Network operation 1;
Manual synchronization:
Turn the main switch of the generator outlet to the pre-closing position (vertical position); observe that the combination synchronization table on the left is turned to close to 12 o'clock position, manually close the main switch, the red light is on, and the grid connection is successful;
1. First, we need to understand some things
The perennial wind source in the area, at the height of the wind wheel The annual average wind speed should not be less than 6/second;
(You can check the local meteorological department and local residents for the wind source. Residents generally know better, and the meteorological bureau has more data);
p>2. Terrain (preferably at a higher level or closer to the seaside);
3. Grid laying conditions, extreme climate conditions, local electricity price consumption, etc.
4. The area must be large, at least several square kilometers;
5. Establish a wind measurement tower to measure wind resource data for more than one year. This requires local Assistance from relevant departments.
6. In the end, it is necessary to obtain the consent of the local government and residents, otherwise everything will be in vain.