1. When selecting construction land for wind power projects, areas with open terrain and no obstructions should be selected as much as possible to ensure the adequacy and stability of wind energy resources.
2. The area of wind power project construction land should be reasonably determined based on factors such as project capacity, wind energy resources, equipment layout, etc., and should meet the requirement of approximately 1 to 2 hectares per megawatt of installed capacity. Require.
3. The construction land for wind power projects should comply with national and local land use planning requirements, and should not occupy important ecological functional areas such as cultivated land, forestland, and ecological protection zones.
4. The construction land for wind power projects should have good geological conditions and bearing capacity, and be able to meet the requirements for the fixation of wind turbines and the construction of infrastructure.
5. The construction land for wind power generation projects should have good traffic conditions and supporting facilities to facilitate equipment transportation, construction and maintenance.
6. The construction land for wind power projects should comply with environmental protection requirements and should not cause serious pollution or damage to the surrounding environment. It is necessary to protect the ecological environment and cultural heritage.