Applicants that are required to configure 2 hours of energy storage and implement market-oriented conditions for leased or self-built electrochemical energy storage power stations shall have every 10,000 kWh leased or self-built electrochemical energy storage power station completed and completed before the comprehensive review. If the company is online, 0.1 points will be added to the reporting enterprises that rent or build themselves. According to the "Notice on Carrying out the Competitive Allocation of the Grid-connected Scale of the First Batch of Wind Power and Photovoltaic Power Generation Projects in 2022" issued by the Energy Bureau, it can be seen that the competitive allocation requirements for wind power and photovoltaic development require the allocation of 2 hours of energy storage, and for leasing or owning For applying companies that implement market-oriented conditions for building electrochemical energy storage power stations, for every 10,000 kWh leased or self-built electrochemical energy storage power station that is connected to the grid before the comprehensive review, 0.1 points will be added to the applying company for leasing or self-built power stations.
Various competing requirements for wind power and photovoltaic development
Introduction Various competition requirements for wind power and photovoltaic development require the allocation of 2 hours of energy storage, and the applying companies that implement market conditions for leasing or self-built electrochemical energy storage power st