1. First, pull the main wheel shaft of the generator outward to facilitate subsequent belt winding.
2. Then adjust the position of the main wheel shaft of the generator accurately.
3. Then pull the two idler wheels of the generator outward.
4. Then wrap the generator belt around the main shaft of the generator.
5. Then wrap the belt around the idler pulley of the generator.
6. Install the generator casing so that the belt is installed.
The installation steps of the Great Wall Fengjun 5 pickup generator belt are as follows:
1. First, pull out the main shaft of the generator to facilitate subsequent winding of the belt.
2. Then, accurately adjust the position of the generator main shaft.
3. Then pull the two idlers of the generator outward.
4. Then wrap the generator belt around the main shaft of the generator.
5. Then wrap the belt around the idler pulley of the generator.
6. Install the generator casing to facilitate the installation of the belt.