Boiler indicators: exhaust gas temperature, boiler oxygen content, fly ash combustibles, slag combustibles, air preheater leakage rate, pulverized coal fineness, soot blower input rate, main steam temperature, reheat steam temperature, main Steam pressure, superheater desuperheating water volume, reheater desuperheating water volume
Turbine indicators: condenser vacuum, vacuum tightness, condenser end difference, condensate water subcooling degree, condenser glue Ball cleaning device input rate, ball collection rate, feed water temperature, heater terminal difference, high heating input rate, insulation effect
Generation, power supply, and electricity consumption are completed at the same time. The power plant will adjust the operating load according to user needs and dispatch requirements.
It operates at full load during peak periods and at reduced load during trough periods (late midnight).
Power plants generally overfulfill their tasks and rarely fail to complete their power generation plans.