The wire coverage of the city is 10 x 10.
Electricity installation method:
So that a city works, it must first have electricity and water. Let's first explain the installation of electricity. There are two types of facilities that can produce electricity in games: green power generation and resource-intensive power generation. At the start of the game, the power plants that can be used are limited and you can only build wind turbines and coal-fired power plants. I personally recommend that you try not to use green energy production facilities.
The reason is that green energy production is not very stable and will be affected by weather conditions, and the CP value is too low. The maximum power of five wind turbines is equal to that of a coal-fired power plant. In terms of construction pricetion, wind turbines are difficult to compare to coal-fired power plants.
Although in the long term the maintenance costs of green power generation will be much lower, at a later stage these preliminary power generation facilities will be eliminated. Simply building three or four nuclear power plants can meet the needs. demand for approximately 10W population used.
Regarding electrical connections, when you build a coal-fired power plant, a blue area will appear. Everything within this blue range will have power, and all buildings will have some blue range. Therefore, the power tower connection only needs to be connected to the blue range, and there is no need to go deep there. .
On the one hand, all grilles can be used in the building, and on the other hand, it will be more convenient to dismantle themlater. And when cities grow, unnecessary power towers can be demolished. Dismantling some unnecessary power towers can still allow electricity to be transmitted everywhere, even if part of the power towers is removed.
Therefore, the benchmark for power transmission is that as long as the blue range power grid is connected, unless the distance between the two blue power grids is too large, a Power tower will be required to connect.
Method of laying water pipes and cables:
Cables are very troublesome to install. You have to connect them at the beginning and wait until all your city works are completed. the zones are connected. After receiving power, that is, once the blue zones are connected, excess cables can be removed to ensure that the power station and the urban zoneare not connected. For example, if the power plant is connected to the urban area. , there is no need to erect cables. Additionally, once cable construction is complete, a new road can be built underneath, provided it does not cross the base. Cables and water pipes need to be routed all the way around, they just need to stay in contact.
In case of partial water shortage, check if there are any parts that are not covered. If there is a total lack of water, check if the water pump is powered and if the water lines are actually powered. connected.
As the power plant produces noise and pollution, it must be separated from residential areas. Under normal circumstances, you need to pull the cable, but this will affect the appearance. But as long as there are buildings in the planned area, electricity will be automatically supplied. In other words, once the highway is flatified, a residential zone will be built in zone A, an industrial zone will be built in zone B and a commercial zone. The zone will be built in the area between A and B. This will provide all the power supply. Note that due to early demand, if you plan too many zones, you will not be able to build buildings in a timely manner, requiring selective zone planning.