12 months. According to requests from Power Construction China, the winning bid amount for the one million kilowatt wind power project is approximately RMB 9.967 billion. The project works include survey and design, procurement of equipment and materials, civil construction and installation of the one million kilowatt Sheyang Wind Power Project. offshore wind energy project. The estimated construction period is 12 months.
1. First of all, we need to understand some things.
The year-round wind source in the area, the annual average wind speed at the height of the wind wheel should not be less than 6 /second;
(For wind sources, you can check the local weather service and local residents. Residents are usually better informed. The weather office has more data);
2. Terrain (preferably higher or higher (Places closer to theseaside);
3. Network installation conditions, extreme weather conditions, local electricity consumption prices, etc.
4. The area must be large, at least several square kilometers;
5. Establish a wind measuring tower to measure wind resource data for more than one year; of the departments concerned.
6. Ultimately, it is necessary to obtain the consent of the local government and residents, otherwise everything will be in vain.