The process of converting installed wind capacity into production capacity is as follows:
Available production capacity = installed wind capacity × wind turbine operating hours
Example: p>< p>A wind power plant with an installed capacity of 200 MW has a total working hours of 2,000 hours per year, its electricity production capacity is therefore: 200 MW*2,000 = 400,000 MW. That is to say, the wind power plant can produce 400 million kWh of electricity per year.