Nantong New Energy's wind blade factory is tired. The reasons are:
1. The technology and production process are not sufficiently optimized: Wind turbine blades are a large and complex product, and their production process requires multiple links and processes for each link and process. is not optimized and the improvement will lead to low production efficiency, thereby increasing the labor intensity and workload of workers.
2. Low degree of artificial intelligence and machine automation: The automation of the production line of Nantong New Energy wind turbine blade factory is low, requiring workers to do a lot of physical labor and heavy tasks.
3. Insufficient staff: The number of workers on the production line of Nantong New Energy's wind turbine blade factory is insufficient, requiring each jobThey have to bear more workload and work intensity, thus increasing the level of fatigue. .
4. Poor working environment and equipment conditions: If the working environment and equipment conditions of Nantong new energy wind turbine blade factory are poor, such as poor ventilation, excessive noise, temperature excessive, etc. have harmful effects on the health of workers. This affects health and working condition, increasing work intensity and worker fatigue.
Does the questioner want to ask: “What does Nantong Ailang Wind Turbine Fan Factory do? » According to the official survey of Nantong Ailang Wind Turbine Fan Factory, employees' job responsibilities include simple tasks such as spraying glue, laying film, closing film and brushing glue. Nantong Ailang Wind Powerr Technology Development Co., Ltd. was established on July 18, 2018. The legal representative is Hu Pei and the registered capital is 360 million yuan.