Take two teams. According to information from the Sohu official website, the China Resources photovoltaic plant operates on a two-shift system, with three people per shift, rotating every five days. The shift team is on duty from 8:00 a.m. to 5:30 p.m. during the day. (8:00 a.m. - 5:00 p.m. in winter) ), and will be on call the rest of the time to ensure that there is someone on duty in the plant 24 hours a day. China Resources Power operates 141 wind farms, 31 photovoltaic power plants and 2 hydroelectric power plants. The total installed capacity attributable to the exploitation of wind energy, photovoltaic power generation and hydroelectricity is 15,441 MW, which represents approximately 32.2% of the total installed capacity attributable to exploitation.
How to work shifts at the China Resources photovoltaic plant
Introduction How does China Resources' photovoltaic power plant adopt two-shift system? According to information published on the Sohu official website, the China Resources photovoltaic plant operates on a two-shift system, with three people per shift, rotating every