The 14 tests of the new energy network test include, but are not limited to, insulation resistance test, earthing resistance test, transformer test, circuit breaker test, test disconnector, mutual inductance test, capacitor test, reactor test, surge arrester test, transmission line testing, distribution line testing, power plant testing, wind power generation testing and photovoltaic energy production tests. These tests are designed to ensure that new energy equipment can operate safely and stably when connected to the grid, and complies with current electrical standards and regulations.
What are the 14 elements of the new energy network integration tests?
Introduction What are the 14 elements of new energy network integration testing? The 14 items of new energy network integration testing include, but are not limited to, insulation resistance test, grounding resistance test, transformer test, circuit breaker test, isol