2080 hours. According to the official website of the State-owned Assets Supervision and Administration Commission of the State Council, the Huadian Tieling Xintianbao Wind Power Project is the third phase of the project of Tieling Wind Power Company, with a construction scale of 48 000 kilowatts and the installation of 24 wind turbines. turbines with a single unit capacity of 2,000 kilowatts. The annual designed power connected to the grid is 99.863 million kilowatt hours, and the annual electricity production. The number of hours of use is 2,080 hours.
200 electrical power. Because 100,000 kilowatts corresponds to 100 MW. Calculated based on 2,000 full operating hours per year, this represents 200 electrical power. Therefore, the annual wind energy production of 100,000 kilowatts is equivalent to 200 electrical power. Wind power generation refers to the conversion of kinetic energy from wind into electricity.electrical energy. Wind energy is a clean, non-polluting renewable energy.