The company has a total investment of 380 million and covers an area of 300 acres. The first phase of the project is 50 acres, the second phase is 250 acres, the first phase of the factory has a production area of 5,800 square meters, and the auxiliary area is about 3,000 square meters. The second phase of the project has a production area of 24,000 square meters and an auxiliary production area of approximately 10,000 square meters. After the project is completed, it will have an annual production capacity of 2,000 sets of various electric blades above. 750KW.
An important feature of the second phase of the plant is that the plant is laid out according to the blade process flow. The main plant has double spans and a total length of 400 meters. forming workshop, blade repair workshop and blade assembly workshop. The blades are produced as soon as they leave the factory, which avoids round-trip transportextremely long products.
After more than a year of intense preparation and product development, the company's product research and development capabilities, production technology core team and hardware facilities have been started to take shape. In particular, the company's technical force is composed of several senior researcher-level engineers who receive government subsidies from the State Council as leaders in the fields of aerodynamics, structure, strength, composite material technology and other disciplines, forming a department of management, scientific research, testing and production. team with aviation technology as its backbone. With the guarantee of financial and technical foundation, we will use the advantages of aviation propeller technology and learn from wind turbine blade management technology and experienceforeign companies to develop wind turbine blade products with completely independent intellectual property rights.